API: 15-163-21321
Operator: PETROLEUM INC. Field: Cooper Lease: Teall Well 3 |
Location: T10S R20W, Sec. 30, SE SW NW
2250 South, 990 East, from NW corner Longitude: -99.6013556 Latitude: 39.1556156 County: Rooks Status: D&A |
Spud Date: 21-MAY-81
Completion Date: 28-MAY-81 Plugging Date: 28-MAY-81 Total Depth: 3775 Form. at depth: ARBUCKLE GROUP Elevation: 2129 KB |
DST Report |