API: 15-199-20221
Operator: Red Oak Energy Inc. Field: Mount Sunflower Northeast Lease: NE MT SUNFLOWER Well 1-30 |
Location: T15S R41W, Sec. 30, NE NE NE
4950 North, 330 West, from SE corner Longitude: -101.9107385 Latitude: 38.7259423 County: Wallace Status: D&A |
Spud Date: 28-JUL-94
Completion Date: 06-AUG-94 Plugging Date: 06-AUG-94 Total Depth: 5250 Form. at depth: MISSISSIPPIAN Elevation: 3819 KB |
DST Report |