Drill Stem Tests Database
Specific Well--15-129-21562
API: 15-129-21562
Operator:
Field: Taloga North
Lease: SANTA FE 'C'
Well 3
Location: T34S R42W, Sec. 16, NW NE
660 South, 1980 West, from NE corner
Longitude: -101.8880098
Latitude: 37.0958179
County: Morton
Status: GAS-P&A
Spud Date: 07/16/1998
Completion Date: 08/24/1998
Plugging Date: 01/28/2000
Total Depth: 5000
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3466 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4180 to 4300
Formation tested: Upper Morrow
Date, Time: 07/23/1998; 07:42:35
Initial Hydro Pressure: 1990 PSI
First Initial Flow Pressure: 33 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 59 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 43 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1955 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 700 ft.
Drill Pipe Length: 3474 ft.
Weak 1/2"" blow built to strong, OBB in 6 min. I.F.P. No blow-back. I.S.I.P. Weak 1/2"" blow built to 3 1/2"" in 5 min F.F.P. Hole extremly sticky. Pulled loose im- mediatly after rotating for F.S.I.P.
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 25
Samples: None
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
1140 of GIP
60 of Mud 100%M
1840 of Salinity (PPM)
View Pressures No Recovery Gas data.