|
API: 15-129-21566
Operator: BONNEVILLE FUELS CORPORATION Field: Kinsler Lease: BFC Warring Trust Well 1 |
Location: T32S R40W, Sec. 3, NW SE SW
990 North, 1650 East, from SW corner Longitude: -101.6585496 Latitude: 37.2896656 County: Morton Status: GAS |
Spud Date: 09/01/1998
Completion Date: 12/14/1998 Plugging Date: Total Depth: 5620 Form. at depth: SPRINGER Elevation: 3312 KB |
| Test Number: | Data Source: TRILOBITE |
|
Interval: to
Formation tested: | Date, Time: 09/23/1998; 11:49:08 |
|
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5208 to 5229
Formation tested: Keys | Date, Time: 09/08/1998; 21:36:15 |
|
Initial Hydro Pressure: 2487 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 1260 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 69 PSI Final Shut-in Pressure: 1447 PSI Final Hydro Pressure: 2468 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 700 ft. Drill Pipe Length: 4489 ft. |
| Weak 1"", built to strong OBB in 4 min. No blow-back. I.S.I.P. Strong, OBB immed. GTS in 43 min. Guag- ed 7,120 CFPD. F.F.P. 1"" blow-back. F.S.I.P. | |
|
Bottom Hole Temperature: 136 DEG F
Percent Porosity: 13 Samples: One Gas Recovery: Comments: | |
|
Recovery 120 of Total Fluid 120 of Fluid in Drill Collars 5069 of GIP 90 of Cln Gassy Oil 20%G 80%O 30 of Hvly Mud cut Gassy Oil 5%G 49%O 46%M 48 of Gravity (API) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5195 to 5220
Formation tested: Keys | Date, Time: 09/20/1998; 11:01:42 |
|
Initial Hydro Pressure: 2522 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 31 PSI Initial Shut-in Pressure: 332 PSI Second Initial Flow Pressure: 33 PSI Second Final Flow Pressure: 41 PSI Final Shut-in Pressure: 548 PSI Final Hydro Pressure: 2499 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 670 ft. Drill Pipe Length: 4521 ft. |
| Weak 1/2"", built to 6"" in 15 min. I.F.P. No blow-back. I.S.I.P. Fair 6"", built to strong OBB in 9 min. F.F.P. No blow-back. F.S.I.P. Re-mark: Wall stuck 14 stds off bottom. Bottom of tool at 4345'. C-sub at 4230. DC int. From 3620' to 4290'. Spot Oil. | |
|
Bottom Hole Temperature: 136 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Sli Oil cut Mud 5%O 95%M 48 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |