Drill Stem Tests Database
Specific Well--15-129-21572
API: 15-129-21572
Operator: BONNEVILLE FUELS CORPORATION
Field: Kinsler
Lease: BFC Warring Trust
Well 2
Location: T32S R40W, Sec. 3, SE SW NW
3181 North, 4298 West, from SE corner
Longitude: -101.6607834
Latitude: 37.2956852
County: Morton
Status: GAS
Spud Date: 08-OCT-98
Completion Date: 22-DEC-98
Plugging Date:
Total Depth: 5502
Form. at depth: TOPEKA
Elevation: 3287 KB
elog mismarked 3285 KB. --CB 7/13/01

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3050 to 3076
Formation tested: Wabunsee
Date, Time: 11-OCT-98; 14:49:11
Initial Hydro Pressure: 1510 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: 543 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 540 PSI
Final Hydro Pressure: 1492 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 2819 ft.
Strong, OBB in 1 1/2 min. I.F.P. No blow-back. I.S.I.P. Strong immed. GTS in 5 min. Guaged 31,900 CFPD. F.F.P. No blow-back. F.S.I.P. Re-mark: Gas burned. at end of F.F.P. due to shut- ing 2"". Press. up bottle.
Bottom Hole Temperature: 100 DEG F
Percent Porosity: 13
Samples: One
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
3024 of GIP
30 of Sli Gas cut Mud 4%G 96%M
2050 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3115 to 3150
Formation tested: Topeka
Date, Time: 12-OCT-98; 07:28:14
Initial Hydro Pressure: 1513 PSI
First Initial Flow Pressure: 36 PSI
First Final Flow Pressure: 51 PSI
Initial Shut-in Pressure: 370 PSI
Second Initial Flow Pressure: 57 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 370 PSI
Final Hydro Pressure: 1500 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 2881 ft.
Initial Flow: Strong - bottom of bucket in 1 min Gas to surface in 11 minutes Gauged 63500 CFPD Initial Shutin: No blow back
Final Flow: Gauged 159000 CFPD
Final Shutin: No blow back Gas burned
Bottom Hole Temperature: 101 DEG F
Percent Porosity: 17
Samples: One
Gas Recovery:
Comments:
Recovery
140 of Total Fluid
140 of Fluid in Drill Collars
2976 of GIP
140 of Sli Gas cut Mud 6%G 94%M
4800 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3517 to 3548
Formation tested: Toronto
Date, Time: 13-OCT-98; 11:46:19
Initial Hydro Pressure: 1692 PSI
First Initial Flow Pressure: 33 PSI
First Final Flow Pressure: 68 PSI
Initial Shut-in Pressure: 720 PSI
Second Initial Flow Pressure: 77 PSI
Second Final Flow Pressure: 138 PSI
Final Shut-in Pressure: 721 PSI
Final Hydro Pressure: 1691 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3278 ft.
Strong, OBB in 45 sec. I.F.P. No blow-back. I.S.I.P. Weak 1"", built to strong, OBB in 7 min. F.F.P. 1/2"" blow-back. F.S.I.P.
Bottom Hole Temperature: 108 DEG F
Percent Porosity: 20
Samples: None
Gas Recovery:
Comments:
Recovery
265 of Total Fluid
235 of Fluid in Drill Collars
30 of Fluid in Drill Pipe
900 of GIP
30 of Mud 100%M
120 of Wtr cut Mud 26%W 74%M
115 of Sli Mud cut Wtr 88%W 12%M
23500 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5396 to 5434
Formation tested: St. Louis
Date, Time: 21-OCT-98; 07:34:49
Initial Hydro Pressure: 2619 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 98 PSI
Second Initial Flow Pressure: 17 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 53 PSI
Final Hydro Pressure: 2555 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 243 ft.
Drill Pipe Length: 5150 ft.
Initial Flow: Weak surface blow 1/16""
Final Flow: Weak Blow died in 20 minutes
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Collars
1 of Mud 100%
View Pressures No Recovery Gas data.