API: 15-007-22563
Operator: SAGEBRUSH OPERATING Field: Kumberg Southeast Lease: MCINTYRE Well 1-13 |
Location: T30S R12W, Sec. 13, E2 E2 NW
4100 North, 3105 West, from SE corner Longitude: -98.5846103 Latitude: 37.4386843 County: Barber Status: D&A |
Spud Date: 06-APR-98
Completion Date: 16-APR-98 Plugging Date: 16-APR-98 Total Depth: 4825 Form. at depth: ARBUCKLE GROUP Elevation: 1829 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 2738 to 2800
Formation tested: Indian Cavve | Date, Time: 09-APR-98; 20:18:51 |
Initial Hydro Pressure: 1323 PSI
First Initial Flow Pressure: 41 PSI First Final Flow Pressure: 102 PSI Initial Shut-in Pressure: 761 PSI Second Initial Flow Pressure: 110 PSI Second Final Flow Pressure: 170 PSI Final Shut-in Pressure: 750 PSI Final Hydro Pressure: 1317 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2741 ft. |
IF:Strong blow. Btm. of bucket in 75 secs. ISI:Weak blow. (1/4"") FF:Strong blow. Btm. of bucket in 2 mins. FSI:No blow. | |
Bottom Hole Temperature: 95 DEG F
Percent Porosity: 13 Samples: Gas Recovery: Comments: | |
Recovery 310 of Total Fluid 310 of Fluid in Drill Pipe 120 of Gas in pipe. 124 of Drlg. mud 186 of MW 15%m 85%w 27000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4350 to 4386
Formation tested: Miss. | Date, Time: 13-APR-98; 23:01:53 |
Initial Hydro Pressure: 2066 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 315 PSI Second Initial Flow Pressure: 16 PSI Second Final Flow Pressure: 20 PSI Final Shut-in Pressure: 636 PSI Final Hydro Pressure: 2030 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4352 ft. |
IF:Fair to strong blow. Btm. of bucket in 26 mins. ISI:No blow. FF:Strong blow. Btm. of bucket in 10 secs. FSI:Very weak blow. 1/4"" or less. Dead in 15 mins. | |
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 868 of Gas in pipe. 20 of Drlg. mud with a few oil specs. 5200 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4641 to 4659
Formation tested: Simpson | Date, Time: 14-APR-98; 05:09:15 |
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3900 ft. |
IF:None ISI: FF: FSI: | |
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
Recovery 5200 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4641 to 4659
Formation tested: Simpson | Date, Time: 14-APR-98; 14:24:49 |
Initial Hydro Pressure: 2233 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 1554 PSI Second Initial Flow Pressure: 34 PSI Second Final Flow Pressure: 42 PSI Final Shut-in Pressure: 1537 PSI Final Hydro Pressure: 2224 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4632 ft. |
IF:Weak blow. 2 - 2 3/4"" ISI:no blow FF:Weak blow. (surface) Flushed tool 11 mins. in to 2nd open. Weak blow. FSI:no blow | |
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Pipe 60 of SGCM (good oder) 8000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |