API: 15-007-22566
Operator: Woolsey Operating Co., LLC Field: Aetna Gas Area Lease: Z-Bar Cattle Co. Well 6 |
Location: T34S R14W, Sec. 30, NE SW NW
1650 South, 990 East, from NW corner Longitude: -98.8887888 Latitude: 37.0598594 County: Barber Status: OIL |
Spud Date: 03-JUN-98
Completion Date: 24-JUL-98 Plugging Date: Total Depth: 5680 Form. at depth: ARBUCKLE GROUP Elevation: 1680 KB |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4645 to 4679
Formation tested: Swope | Date, Time: 12-JUN-98; 05:51:09 |
Initial Hydro Pressure: 2272 PSI
First Initial Flow Pressure: 71 PSI First Final Flow Pressure: 125 PSI Initial Shut-in Pressure: 1740 PSI Second Initial Flow Pressure: 135 PSI Second Final Flow Pressure: 210 PSI Final Shut-in Pressure: 1786 PSI Final Hydro Pressure: 2230 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4631 ft. |
IF:Strong blow.B.O.B in 30 sec.Gas to surface in 13 minutes. Gauge gas. ISI:Bled down for 20 mins.No blowback FF:Fair blow.Gauge gas. FSI:Bled down for 20mins.Weak surface | |
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Caraway Gas Recovery: Comments: | |
Recovery 422 of Total Fluid 422 of Fluid in Drill Pipe 50 of Very sl. oil specked mud 1%oil 99%mud 120 of sl. gas & water cut mud 10%gas 4%water 86%mud 230 of gas & mud cut water 5%gas1%oil74%water 20%mud 22 of mud & gas cut water 2%gas 68%water 30%mud 73000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: to
Formation tested: (upper)Miss. | Date, Time: 13-JUN-98; 18:00:51 |
Initial Hydro Pressure: 2415 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 547 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 38 PSI Final Shut-in Pressure: 577 PSI Final Hydro Pressure: 2438 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4847 ft. |
IF:Strong blow.B.O.B in 2-1/2 mins. ISI:Bled down for 10 mins.B.O.B in 5 min FF:Strong blow,B.O.B FSI:Bled down for 10 mins.B.O.B in 4 min | |
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Caraway Analytical 728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of VSGCM 96%mud 4%gas 4807 of gas in pipe | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4912 to 4970
Formation tested: (lower)Miss. | Date, Time: 14-JUN-98; 23215515-D |
Initial Hydro Pressure: 2427 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 55 PSI Second Initial Flow Pressure: 36 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 109 PSI Final Hydro Pressure: 2382 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4884 ft. |
IFWeak blow built to 2""in H2O bucket. ISI:Bled down for 5 mins.Very slight FF:Weak blow.Built to 1-1/2""in H2O. FSI:Bled down for 5 mins.B.b to 1/4"" | |
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Pipe 15 of VSGCM 99%mud 1%GAS | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 5310 to 5350
Formation tested: Viola | Date, Time: 16-JUN-98; 21:13:04 |
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5282 ft. |
IFP-strong blow gas surfaced in 5 min. FFP-gas to surface | |
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: gas sample Gas Recovery: Comments: | |
Recovery 485 of Total Fluid 485 of Fluid in Drill Pipe 425 of clean oil 60 of gassy oil cut mud 40%gas 7%oil 53%mud 40 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |