Drill Stem Tests Database
Specific Well--15-007-22572
API: 15-007-22572
Operator: Woolsey Petroleum Corp.
Field: Aetna
Lease: Davis Ranch 'A'
Well 1
Location: T34S R14W, Sec. 5, SW
1295 North, 1270 East, from SW corner
Longitude: -98.8704651
Latitude: 37.1115288
County: Barber
Status: OIL-P&A
Spud Date: 08/05/1998
Completion Date: 09/21/1998
Plugging Date: 11/28/2000
Total Depth: 5440
Form. at depth: ARBUCKLE GROUP
Elevation: 1699 KB

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 5246 to 5280
Formation tested: Simpson
Date, Time: 08/17/1998; 10:30:00
Initial Hydro Pressure: 2540 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 224 PSI
Second Initial Flow Pressure: 25 PSI
Second Final Flow Pressure: 32 PSI
Final Shut-in Pressure: 1270 PSI
Final Hydro Pressure: 2502 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 5227 ft.
IF:Fair blow b.o.b in 14 mins. ISI:Bled down for FF:Strong blow b.o.b in 12 mins. FSI:Bled down for 10 mins.no bb.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
40 of Total Fluid
40 of Fluid in Drill Pipe
40 of GCOM 10%gas 10%oil 80%mud
1250 of pipe
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4520 to 4553
Formation tested: Swope
Date, Time: 03/23/1993; 07:39:24
Initial Hydro Pressure: 2202 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 61 PSI
Initial Shut-in Pressure: 1726 PSI
Second Initial Flow Pressure: 65 PSI
Second Final Flow Pressure: 122 PSI
Final Shut-in Pressure: 1753 PSI
Final Hydro Pressure: 2170 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4504 ft.
IF:Weak blow built to 6""in H2O. ISI:Bled down for 5 mins.No bb. FF:Weak blow built to 7""in H2O. FSI:Bled down fo 10 mins.No bb.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
210 of Fluid in Drill Pipe
120 of salt water
60 of Mud cut water 20%mud 80%water
30 of Heavy mud cut water 60%mud 40%water
100000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4720 to 4785
Formation tested: Upper (Miss)
Date, Time: 08/14/1998; 18:44:45
Initial Hydro Pressure: 2352 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 48 PSI
Initial Shut-in Pressure: 89 PSI
Second Initial Flow Pressure: 54 PSI
Second Final Flow Pressure: 60 PSI
Final Shut-in Pressure: 115 PSI
Final Hydro Pressure: 2290 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 4724 ft.
Initial Flow: Weak blow built to 1"" in water Initial Shutin: Bled down for for minutes no blow back
Final Flow: Dead blow
Final Shutin: No blow back
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
45 of Total Fluid
45 of Fluid in Drill Pipe
45 of Drilling mud 100 %
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5246 to 5280
Formation tested: Simpson
Date, Time: 08/17/1998; 10:30:00
Initial Hydro Pressure: 2540 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 224 PSI
Second Initial Flow Pressure: 25 PSI
Second Final Flow Pressure: 32 PSI
Final Shut-in Pressure: 1270 PSI
Final Hydro Pressure: 2502 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 5227 ft.
IF:Fair blow b.o.b in 14 mins. ISI:Bled down for FF:Strong blow b.o.b in 12 mins. FSI:Bled down for 10 mins.no bb.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
40 of Total Fluid
40 of Fluid in Drill Pipe
40 of GCOM 10%gas 10%oil 80%mud
1250 of pipe
View Pressures No Recovery Gas data.