|
API: 15-007-22572
Operator: Woolsey Petroleum Corp. Field: Aetna Lease: Davis Ranch 'A' Well 1 |
Location: T34S R14W, Sec. 5, SW
1295 North, 1270 East, from SW corner Longitude: -98.8704651 Latitude: 37.1115288 County: Barber Status: OIL-P&A |
Spud Date: 08/05/1998
Completion Date: 09/21/1998 Plugging Date: 11/28/2000 Total Depth: 5440 Form. at depth: ARBUCKLE GROUP Elevation: 1699 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5246 to 5280
Formation tested: Simpson | Date, Time: 08/17/1998; 10:30:00 |
|
Initial Hydro Pressure: 2540 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 224 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 1270 PSI Final Hydro Pressure: 2502 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 5227 ft. |
| IF:Fair blow b.o.b in 14 mins. ISI:Bled down for FF:Strong blow b.o.b in 12 mins. FSI:Bled down for 10 mins.no bb. | |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of GCOM 10%gas 10%oil 80%mud 1250 of pipe | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4520 to 4553
Formation tested: Swope | Date, Time: 03/23/1993; 07:39:24 |
|
Initial Hydro Pressure: 2202 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 61 PSI Initial Shut-in Pressure: 1726 PSI Second Initial Flow Pressure: 65 PSI Second Final Flow Pressure: 122 PSI Final Shut-in Pressure: 1753 PSI Final Hydro Pressure: 2170 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4504 ft. |
| IF:Weak blow built to 6""in H2O. ISI:Bled down for 5 mins.No bb. FF:Weak blow built to 7""in H2O. FSI:Bled down fo 10 mins.No bb. | |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 210 of Total Fluid 210 of Fluid in Drill Pipe 120 of salt water 60 of Mud cut water 20%mud 80%water 30 of Heavy mud cut water 60%mud 40%water 100000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4720 to 4785
Formation tested: Upper (Miss) | Date, Time: 08/14/1998; 18:44:45 |
|
Initial Hydro Pressure: 2352 PSI
First Initial Flow Pressure: 40 PSI First Final Flow Pressure: 48 PSI Initial Shut-in Pressure: 89 PSI Second Initial Flow Pressure: 54 PSI Second Final Flow Pressure: 60 PSI Final Shut-in Pressure: 115 PSI Final Hydro Pressure: 2290 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 4724 ft. |
|
Initial Flow: Weak blow built to 1"" in water Initial Shutin: Bled down for for minutes no blow back Final Flow: Dead blow Final Shutin: No blow back |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 45 of Total Fluid 45 of Fluid in Drill Pipe 45 of Drilling mud 100 % | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5246 to 5280
Formation tested: Simpson | Date, Time: 08/17/1998; 10:30:00 |
|
Initial Hydro Pressure: 2540 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 224 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 1270 PSI Final Hydro Pressure: 2502 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 5227 ft. |
| IF:Fair blow b.o.b in 14 mins. ISI:Bled down for FF:Strong blow b.o.b in 12 mins. FSI:Bled down for 10 mins.no bb. | |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of GCOM 10%gas 10%oil 80%mud 1250 of pipe | |
| View Pressures | No Recovery Gas data. |