Drill Stem Tests Database
Specific Well--15-007-22576
API: 15-007-22576
Operator: Woolsey Petroleum Corp.
Field: Aetna Gas Area
Lease: Spriggs 'D'
Well 2
Location: T33S R13W, Sec. 33, SW NW NE
990 South, 2310 West, from NE corner
Longitude: -98.7392439
Latitude: 37.1349641
County: Barber
Status: GAS
Spud Date: 19-AUG-98
Completion Date: 29-SEP-98
Plugging Date:
Total Depth: 4550
Form. at depth: LANSING GROUP
Elevation: 1682 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2880 to 2953
Formation tested: Indian cave
Date, Time: 22-AUG-98; 15:00:49
Initial Hydro Pressure: 1325 PSI
First Initial Flow Pressure: 76 PSI
First Final Flow Pressure: 413 PSI
Initial Shut-in Pressure: 1163 PSI
Second Initial Flow Pressure: 419 PSI
Second Final Flow Pressure: 713 PSI
Final Shut-in Pressure: 1177 PSI
Final Hydro Pressure: 1285 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 2521 ft.
Initial Flow: Fair blow bottom of bucket in 2 1/2 mins. Initial Shut-in: Bld down for 2 mins. no blow back
Final Flow: Fair blow bottom of bucket in 6 mins.
Final Shut-in: Bled down for 10 mins. no blow back
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1478 of Total Fluid
336 of Fluid in Drill Collars
1142 of Fluid in Drill Pipe
368 of Very slight water cut mud 95%mud 5%water
1110 of salt water
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3712 to 3790
Formation tested: Elgin sd.
Date, Time: 24-AUG-98; 12:58:12
Initial Hydro Pressure: 1823 PSI
First Initial Flow Pressure: 59 PSI
First Final Flow Pressure: 64 PSI
Initial Shut-in Pressure: 989 PSI
Second Initial Flow Pressure: 66 PSI
Second Final Flow Pressure: 71 PSI
Final Shut-in Pressure: 1361 PSI
Final Hydro Pressure: 1804 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3399 ft.
IF:Weak surface blow ISI:No bb. FF:Dead blow. FSI:No bb.
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
30 of drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3916 to 3952
Formation tested: Snyderville sd.
Date, Time: 25-AUG-98; 11:04:08
Initial Hydro Pressure: 1896 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 36 PSI
Initial Shut-in Pressure: 1347 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 51 PSI
Final Shut-in Pressure: 1355 PSI
Final Hydro Pressure: 1860 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3583 ft.
IF:Fair blow b.o.b in 6-1/2 mins. ISI:Bled down for 5 mins.No bb. FF:Strong blow b.o.b in30 sec.G.T.S- FSI:Bled down for 20 mins.No bb.
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples: Caraway analytical 1028 N.Roosevelt
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
90 of VSGCM 6%gas 94%mud
3829 of gas in pipe
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3968 to 4034
Formation tested: Douglas
Date, Time: 26-AUG-98; 11:50:25
Initial Hydro Pressure: 1970 PSI
First Initial Flow Pressure: 75 PSI
First Final Flow Pressure: 94 PSI
Initial Shut-in Pressure: 199 PSI
Second Initial Flow Pressure: 109 PSI
Second Final Flow Pressure: 118 PSI
Final Shut-in Pressure: 274 PSI
Final Hydro Pressure: 1979 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3614 ft.
Initial Flow: Weak blow built to 1"" in H20 bucket Initial Shutin: No blow back
Final Flow: Weak blow built to 1/2""in bucket
Final Shutin: No blow back
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
180 of Total Fluid
180 of Fluid in Drill Collars
180 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4094 to 4120
Formation tested: Lansing ""A""
Date, Time: 27-AUG-98; 07:39:47
Initial Hydro Pressure: 2054 PSI
First Initial Flow Pressure: 77 PSI
First Final Flow Pressure: 147 PSI
Initial Shut-in Pressure: 1448 PSI
Second Initial Flow Pressure: 153 PSI
Second Final Flow Pressure: 204 PSI
Final Shut-in Pressure: 1468 PSI
Final Hydro Pressure: 1988 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3734 ft.
IF:Fair blow built to 5""in H2O. ISI:Bled down FF:Weak FSI:Bled down for 5 mins no bb.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
372 of Total Fluid
336 of Fluid in Drill Collars
36 of Fluid in Drill Pipe
186 of drilling mud
186 of WCM 70%water 30%mud
82000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.