Drill Stem Tests Database
Specific Well--15-007-22576
API: 15-007-22576
Operator: Woolsey Petroleum Corp.
Field: Aetna Gas Area
Lease: Spriggs 'D'
Well 2
Location: T33S R13W, Sec. 33, SW NW NE
990 South, 2310 West, from NE corner
Longitude: -98.7392439
Latitude: 37.1349641
County: Barber
Status: GAS
Spud Date: 19-AUG-98
Completion Date: 29-SEP-98
Plugging Date:
Total Depth: 4550
Form. at depth: LANSING GROUP
Elevation: 1682 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2880 to 2953
Formation tested: Indian cave
Date, Time: 22-AUG-98; 15:00:49
Initial Hydro Pressure: 1325 PSI
First Initial Flow Pressure: 76 PSI
First Final Flow Pressure: 413 PSI
Initial Shut-in Pressure: 1163 PSI
Second Initial Flow Pressure: 419 PSI
Second Final Flow Pressure: 713 PSI
Final Shut-in Pressure: 1177 PSI
Final Hydro Pressure: 1285 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 2521 ft.
Initial Flow: Fair blow bottom of bucket in 2 1/2 mins. Initial Shut-in: Bld down for 2 mins. no blow back
Final Flow: Fair blow bottom of bucket in 6 mins.
Final Shut-in: Bled down for 10 mins. no blow back
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1478 of Total Fluid
336 of Fluid in Drill Collars
1142 of Fluid in Drill Pipe
368 of Very slight water cut mud 95%mud 5%water
1110 of salt water
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3712 to 3790
Formation tested: Elgin sd.
Date, Time: 24-AUG-98; 12:58:12
Initial Hydro Pressure: 1823 PSI
First Initial Flow Pressure: 59 PSI
First Final Flow Pressure: 64 PSI
Initial Shut-in Pressure: 989 PSI
Second Initial Flow Pressure: 66 PSI
Second Final Flow Pressure: 71 PSI
Final Shut-in Pressure: 1361 PSI
Final Hydro Pressure: 1804 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3399 ft.
IF:Weak surface blow ISI:No bb. FF:Dead blow. FSI:No bb.
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
30 of drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3916 to 3952
Formation tested: Snyderville sd.
Date, Time: 25-AUG-98; 11:04:08
Initial Hydro Pressure: 1896 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 36 PSI
Initial Shut-in Pressure: 1347 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 51 PSI
Final Shut-in Pressure: 1355 PSI
Final Hydro Pressure: 1860 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3583 ft.
IF:Fair blow b.o.b in 6-1/2 mins. ISI:Bled down for 5 mins.No bb. FF:Strong blow b.o.b in30 sec.G.T.S- FSI:Bled down for 20 mins.No bb.
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples: Caraway analytical 1028 N.Roosevelt
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
90 of VSGCM 6%gas 94%mud
3829 of gas in pipe
View Pressures View Recovery Gas
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3968 to 4034
Formation tested: Douglas
Date, Time: 26-AUG-98; 11:50:25
Initial Hydro Pressure: 1970 PSI
First Initial Flow Pressure: 75 PSI
First Final Flow Pressure: 94 PSI
Initial Shut-in Pressure: 199 PSI
Second Initial Flow Pressure: 109 PSI
Second Final Flow Pressure: 118 PSI
Final Shut-in Pressure: 274 PSI
Final Hydro Pressure: 1979 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3614 ft.
Initial Flow: Weak blow built to 1"" in H20 bucket Initial Shutin: No blow back
Final Flow: Weak blow built to 1/2""in bucket
Final Shutin: No blow back
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
180 of Total Fluid
180 of Fluid in Drill Collars
180 of Drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4094 to 4120
Formation tested: Lansing ""A""
Date, Time: 27-AUG-98; 07:39:47
Initial Hydro Pressure: 2054 PSI
First Initial Flow Pressure: 77 PSI
First Final Flow Pressure: 147 PSI
Initial Shut-in Pressure: 1448 PSI
Second Initial Flow Pressure: 153 PSI
Second Final Flow Pressure: 204 PSI
Final Shut-in Pressure: 1468 PSI
Final Hydro Pressure: 1988 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 3734 ft.
IF:Fair blow built to 5""in H2O. ISI:Bled down FF:Weak FSI:Bled down for 5 mins no bb.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
372 of Total Fluid
336 of Fluid in Drill Collars
36 of Fluid in Drill Pipe
186 of drilling mud
186 of WCM 70%water 30%mud
82000 of Salinity (PPM)
View Pressures No Recovery Gas data.