Drill Stem Tests Database
Specific Well--15-007-22580
API: 15-007-22580
Operator: MCGINNESS OIL CO. OF KS, INC.
Field: Medicine River
Lease: Frieden
Well 1
Location: T31S R12W, Sec. 32, W2 SW NW
3350 North, 4950 West, from SE corner
Longitude: -98.657565
Latitude: 37.3064502
County: Barber
Status: O&G-P&A
Spud Date: 14-SEP-98
Completion Date: 23-SEP-98
Plugging Date: 24-SEP-98
Total Depth: 4606
Form. at depth: SIMPSON GROUP LOWER
Elevation: 1539 KB

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 4480 to 4522
Formation tested: Simpson
Date, Time: 22-SEP-98; 17:50:00
Initial Hydro Pressure: 2214 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 133 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 46 PSI
Final Hydro Pressure: 2180 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 4236 ft.
IF:Weak surface blow died in 14 mins. ISI:No bb. FF:No blow. FSI:No bb.
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of VSWCM 98%Mud 2%water
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4500 to 4527
Formation tested: Simpson
Date, Time: 23-SEP-98; 07:28:22
Initial Hydro Pressure: 2241 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 1677 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 60 PSI
Final Shut-in Pressure: 1656 PSI
Final Hydro Pressure: 2159 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 4264 ft.
IF:Weak blow built to 1-1/2""in H2O. ISI:Bled down for 5 mins.no bb. FF:Weak blow built to 1/4""in H2O. FSI:Bled down for 5 mins no bb.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
40 of SOCM 10%oil 90%mud
50 of VSOCMW 10%oil 30%water 60%mud
19000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 3115 to 3273
Formation tested: Topeka
Date, Time: 18-SEP-98; 20:36:55
Initial Hydro Pressure: 1476 PSI
First Initial Flow Pressure: 1232 PSI
First Final Flow Pressure: 1401 PSI
Initial Shut-in Pressure: 1423 PSI
Second Initial Flow Pressure: 1420 PSI
Second Final Flow Pressure: 1426 PSI
Final Shut-in Pressure: 1428 PSI
Final Hydro Pressure: 1438 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 3109 ft.
Initial Flow: Strong blow - bottom of bucket in 15 seconds Initial Shutin: Bled down for 10 min - no blow back
Final Flow: Strong blow bottom of bucket in 1 minute
Final Shutin: Bled down for 10 min - no blow back
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2887 of Total Fluid
238 of Fluid in Drill Collars
2649 of Fluid in Drill Pipe
60 of Slightly water cut mud 20%water 80%mud
2767 of Water Cut Mud 80%water 20%mud
60 of Salt water 100%water
96000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3890 to 3910
Formation tested: Drum
Date, Time: 20-SEP-98; 18:21:21
Initial Hydro Pressure: 1852 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 1488 PSI
Second Initial Flow Pressure: 57 PSI
Second Final Flow Pressure: 71 PSI
Final Shut-in Pressure: 1485 PSI
Final Hydro Pressure: 1817 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 3544 ft.
IF:Weak blow built to 2ins.in H2O. ISI:Bled down for 2 mins.no bb. FF:Weak blow built to 1/4 ins.in H2O. FSI:Bled down for 10 mins.no bb.
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of WCM 50%Mud 50%Water
32000 of Salinity (PPM)
View Pressures No Recovery Gas data.