Drill Stem Tests Database
Specific Well--15-007-22592
API: 15-007-22592
Operator: Herman L. Loeb, LLC
Field: Medicine Lodge
Lease: McKee
Well 10
Location: T33S R13W, Sec. 20, SE SE SE
510 North, 270 West, from SE corner
Longitude: -98.7499272
Latitude: 37.1535614
County: Barber
Status: D&A
Spud Date: 07-JAN-99
Completion Date: 17-JAN-99
Plugging Date: 17-JAN-99
Total Depth: 4700
Form. at depth: MISSISSIPPIAN
Elevation: 1655 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3887 to 3906
Formation tested: Snyderville
Date, Time: 13-JAN-99; 02:59:48
Initial Hydro Pressure: 1834 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 19 PSI
Initial Shut-in Pressure: 123 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 18 PSI
Final Shut-in Pressure: 34 PSI
Final Hydro Pressure: 1827 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3869 ft.
Initial Flow: Weak blow built to 1"" in diesel bucket Initial Shut-in: No blow back
Final Flow: Weak surface blow
Final Shut-in: No blow back
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
15 of drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4421 to 4440
Formation tested: Swope
Date, Time: 15-JAN-99; 03:21:07
Initial Hydro Pressure: 2148 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 1494 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 98 PSI
Final Shut-in Pressure: 1465 PSI
Final Hydro Pressure: 2157 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
IF: ISI:Bled down for 10 mins.Weak bb.1/2"". FF:Strong blow bob in 42 mins.Gauge gas. FSI:Bled down for 10 mins
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Pipe
20 of W&GCM 20%gas 20%water 60%mud
60 of G&WCM 14%gas 42%water 44%mud
60 of SMCW 90%water 10%mud
60 of VSMCW 98%water 2%mud
4234 of Gas in pipe
110000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.