API: 15-025-21172
Operator: WHITE, KENNETH S. Field: Harper Ranch Lease: McIntyre Well 1-X |
Location: T33S R21W, Sec. 14, E2 E2 E2 SW
1320 North, 2690 West, from SE corner Longitude: -99.570292 Latitude: 37.1666817 County: Clark Status: GAS-P&A |
Spud Date: 29-APR-98
Completion Date: 13-MAY-98 Plugging Date: 13-MAY-98 Total Depth: 5450 Form. at depth: MISSISSIPPIAN Elevation: 1863 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5326 to 5377
Formation tested: Marrow | Date, Time: 10-MAY-98; 02:01:51 |
Initial Hydro Pressure: 2600 PSI
First Initial Flow Pressure: 48 PSI First Final Flow Pressure: 132 PSI Initial Shut-in Pressure: 1964 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 162 PSI Final Shut-in Pressure: 1313 PSI Final Hydro Pressure: 2483 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 238 ft. Drill Pipe Length: 5108 ft. |
IF:Weak blow.Built to 1-1/2""in H2O. ISI:Bled down for 3 mins.No bb. FF:Very weak blow.Died in 20 mins. FSI:No bb. | |
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 70 of Total Fluid 70 of Fluid in Drill Collars 70 of drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5353 to 5401
Formation tested: | Date, Time: 10-MAY-98; 15:45:01 |
Initial Hydro Pressure: 2510 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2507 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 238 ft. Drill Pipe Length: 5107 ft. |
IF: stopped 10' from bottom FF: | |
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 540 of Total Fluid 238 of Fluid in Drill Collars 302 of Fluid in Drill Pipe 540 of drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5353 to 5401
Formation tested: | Date, Time: 11-MAY-98; 09:16:07 |
Initial Hydro Pressure: 2621 PSI
First Initial Flow Pressure: 153 PSI First Final Flow Pressure: 214 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2617 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 238 ft. Drill Pipe Length: 5107 ft. |
IF:Fair blow built to B.O.B FF: | |
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 820 of Total Fluid 238 of Fluid in Drill Collars 582 of Fluid in Drill Pipe 310 of drilling mud 99%mud less than 1%gas 510 of VSGCM 90%MUD 10%GAS | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5393 to 5401
Formation tested: (lower}Morrow | Date, Time: 11-MAY-98; 21:21:53 |
Initial Hydro Pressure: 2656 PSI
First Initial Flow Pressure: 33 PSI First Final Flow Pressure: 93 PSI Initial Shut-in Pressure: 1930 PSI Second Initial Flow Pressure: 101 PSI Second Final Flow Pressure: 150 PSI Final Shut-in Pressure: 1935 PSI Final Hydro Pressure: 2547 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 238 ft. Drill Pipe Length: 5136 ft. |
IF:Weak blow.Built to 6in.in H2O. . ISI:Bled down 5 mins.No BB. FF:Weak blow.Built to4-1/2 ins.in H2O. FSI:Bled down for 5 mins.No bb. | |
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 294 of Total Fluid 238 of Fluid in Drill Collars 56 of Fluid in Drill Pipe 100 of SOCM Trace Gas 2%gas 8%oil 90%mud 60 of O@GCMW 4%oil 24%water 62%mud 134 of Salt Water 100%water 50000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 5281 to 5318
Formation tested: (upper}Morrow | Date, Time: 12-MAY-98; 20:04:40 |
Initial Hydro Pressure: 2623 PSI
First Initial Flow Pressure: 47 PSI First Final Flow Pressure: 149 PSI Initial Shut-in Pressure: 1592 PSI Second Initial Flow Pressure: 135 PSI Second Final Flow Pressure: 231 PSI Final Shut-in Pressure: 1582 PSI Final Hydro Pressure: 2622 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 238 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow, built to bottom of bucket in 2 1/2mins. Initial Shut-in: Bled down 4 mins. blow back to 2"" slowly died off Final Flow: Strong blow bottom of bucket in 3 mins. Final Shut-in: Bled down 4 mins.B.o.B in 19 mins. |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 418 of Total Fluid 238 of Fluid in Drill Collars 180 of Fluid in Drill Pipe 78 of Gas and oil cut mud 140 of Oil and gas cut watery mud 200 of Slight oil cut water mud 27000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |