API: 15-025-21177
Operator: Field: Mccolm Lease: Lucky Lady Well 14 |
Location: T30S R21W, Sec. 14, SW NW
1980 South, 550 East, from NW corner Longitude: -99.5898333 Latitude: 37.4333914 County: Clark Status: D&A |
Spud Date: 24-NOV-98
Completion Date: 05-DEC-98 Plugging Date: 05-DEC-98 Total Depth: 5400 Form. at depth: MISSISSIPPIAN Elevation: 2329 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5194 to 5220
Formation tested: Huck | Date, Time: 02-DEC-98; 19:27:21 |
Initial Hydro Pressure: 2521 PSI
First Initial Flow Pressure: 71 PSI First Final Flow Pressure: 100 PSI Initial Shut-in Pressure: 230 PSI Second Initial Flow Pressure: 90 PSI Second Final Flow Pressure: 91 PSI Final Shut-in Pressure: 201 PSI Final Hydro Pressure: 2458 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 295 ft. Drill Pipe Length: 4881 ft. |
Initial Flow: Strong blow botto of bucket in 5-10 secs. Initial Shut-in: Weak blow;increasing to bottom of bucket in 75 mins. Final Flow: Strong blow. bottom of bucket in 12 mins. Final Shut-in: Weak increasing to bottom of bucket in 85 mins. |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 25 of Total Fluid 25 of Fluid in Drill Collars 25 of Drilling mud 6800 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5237 to 5266
Formation tested: Miss/trydent/! | Date, Time: 03-DEC-98; 17:50:52 |
Initial Hydro Pressure: 2529 PSI
First Initial Flow Pressure: 53 PSI First Final Flow Pressure: 67 PSI Initial Shut-in Pressure: 194 PSI Second Initial Flow Pressure: 72 PSI Second Final Flow Pressure: 81 PSI Final Shut-in Pressure: 141 PSI Final Hydro Pressure: 2477 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292.59 ft. Drill Pipe Length: ft. |
IF:Weak blow built to 7-1/4""in H2O- bucket. ISI:Bled down for 5 mins no bb. FF:Weak blow built to 6""in H2O. FSI:Bled down for 10 min no bb. | |
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 130 of Total Fluid 130 of Fluid in Drill Collars 130 of SOCM 30%oil 70%mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |