Drill Stem Tests Database
Specific Well--15-033-20951
API: 15-033-20951
Operator: IMPERIAL OIL PROPERTIES INC.
Field: Toni-Mike Northeast
Lease: Willbanks
Well 1-17
Location: T32S R18W, Sec. 17, SE SE SE
482 North, 482 West, from SE corner
Longitude: -99.2933746
Latitude: 37.2529612
County: Comanche
Status: GAS
Spud Date: 18-FEB-98
Completion Date: 04-MAR-98
Plugging Date:
Total Depth: 5800
Form. at depth: VIOLA LIMESTONE
Elevation: 2148 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4719 to 4746
Formation tested: Drum
Date, Time: 25-FEB-98; 01:53:44
Initial Hydro Pressure: 2322 PSI
First Initial Flow Pressure: 75 PSI
First Final Flow Pressure: 485 PSI
Initial Shut-in Pressure: 1675 PSI
Second Initial Flow Pressure: 496 PSI
Second Final Flow Pressure: 979 PSI
Final Shut-in Pressure: 1676 PSI
Final Hydro Pressure: 2266 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4699 ft.
IF:Strong blow. Btm. of bucket in 3.5 mins. ISI:No blow. FF:Strong blow. Btm. of bucket in 4 mins. FSI:No blow.
Bottom Hole Temperature: 124 DEG F
Percent Porosity: 15
Samples:
Gas Recovery:
Comments:
Recovery
1890 of Total Fluid
1890 of Fluid in Drill Pipe
120 of MW 30%m 70%w
1770 of Salt water.
119000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5048 to 5070
Formation tested: Altamont
Date, Time: 26-FEB-98; 12:42:27
Initial Hydro Pressure: 2514 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 1190 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 59 PSI
Final Shut-in Pressure: 1106 PSI
Final Hydro Pressure: 2489 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5039 ft.
IF:Strong blow. Btm. of bucket in 15 secs. ISI:No blow. FF:Strong blow. Btm. of bucket in 5 - 10 secs. FSI:No blow.
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
100 of Total Fluid
100 of Fluid in Drill Pipe
2420 of Gas in pipe.
40 of GOCM 10%g 12%o 78%m
60 of SOCGM 3%o 10%w 22%g 65%m
6000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5090 to 5120
Formation tested: Pawnee
Date, Time: 27-FEB-98; 05:31:40
Initial Hydro Pressure: 2512 PSI
First Initial Flow Pressure: 32 PSI
First Final Flow Pressure: 32 PSI
Initial Shut-in Pressure: 1625 PSI
Second Initial Flow Pressure: 40 PSI
Second Final Flow Pressure: 53 PSI
Final Shut-in Pressure: 1583 PSI
Final Hydro Pressure: 2469 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5069 ft.
IF:Weak to fair blow. 1 - 7"" in H20. ISI:No blow. FF:Fair to strong blow. Btm. of bucket in 85 mins. FSI:No blow.
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
75 of Total Fluid
75 of Fluid in Drill Pipe
310 of Gas in pipe.
75 of GCM 10%g 90%m
6000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5194 to 5244
Formation tested: Miss
Date, Time: 28-FEB-98; 06:00:08
Initial Hydro Pressure: 2577 PSI
First Initial Flow Pressure: 100 PSI
First Final Flow Pressure: 73 PSI
Initial Shut-in Pressure: 417 PSI
Second Initial Flow Pressure: 97 PSI
Second Final Flow Pressure: 65 PSI
Final Shut-in Pressure: 408 PSI
Final Hydro Pressure: 2526 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5190 ft.
IF:Strong blow. GTS in 4 mins. (see gas volume report) ISI:No blow after 10 min. blow down. FF:Strong blow. (see gas volume report) FSI:As initial shut in.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 12
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
45 of Total Fluid
45 of Fluid in Drill Pipe
5150 of Gas in pipe.
45 of SGCM 3%g 97%m
8000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: Data Source: TRILOBITE
Interval: to
Formation tested:
Date, Time: 02-MAR-98; 20:26:37
  Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.