|
API: 15-033-20951
Operator: IMPERIAL OIL PROPERTIES INC. Field: Toni-Mike Northeast Lease: Willbanks Well 1-17 |
Location: T32S R18W, Sec. 17, SE SE SE
482 North, 482 West, from SE corner Longitude: -99.2933746 Latitude: 37.2529612 County: Comanche Status: GAS |
Spud Date: 18-FEB-98
Completion Date: 04-MAR-98 Plugging Date: Total Depth: 5800 Form. at depth: VIOLA LIMESTONE Elevation: 2148 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4719 to 4746
Formation tested: Drum | Date, Time: 25-FEB-98; 01:53:44 |
|
Initial Hydro Pressure: 2322 PSI
First Initial Flow Pressure: 75 PSI First Final Flow Pressure: 485 PSI Initial Shut-in Pressure: 1675 PSI Second Initial Flow Pressure: 496 PSI Second Final Flow Pressure: 979 PSI Final Shut-in Pressure: 1676 PSI Final Hydro Pressure: 2266 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4699 ft. |
| IF:Strong blow. Btm. of bucket in 3.5 mins. ISI:No blow. FF:Strong blow. Btm. of bucket in 4 mins. FSI:No blow. | |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: 15 Samples: Gas Recovery: Comments: | |
|
Recovery 1890 of Total Fluid 1890 of Fluid in Drill Pipe 120 of MW 30%m 70%w 1770 of Salt water. 119000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5048 to 5070
Formation tested: Altamont | Date, Time: 26-FEB-98; 12:42:27 |
|
Initial Hydro Pressure: 2514 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 41 PSI Initial Shut-in Pressure: 1190 PSI Second Initial Flow Pressure: 42 PSI Second Final Flow Pressure: 59 PSI Final Shut-in Pressure: 1106 PSI Final Hydro Pressure: 2489 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5039 ft. |
| IF:Strong blow. Btm. of bucket in 15 secs. ISI:No blow. FF:Strong blow. Btm. of bucket in 5 - 10 secs. FSI:No blow. | |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
|
Recovery 100 of Total Fluid 100 of Fluid in Drill Pipe 2420 of Gas in pipe. 40 of GOCM 10%g 12%o 78%m 60 of SOCGM 3%o 10%w 22%g 65%m 6000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5090 to 5120
Formation tested: Pawnee | Date, Time: 27-FEB-98; 05:31:40 |
|
Initial Hydro Pressure: 2512 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1625 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 1583 PSI Final Hydro Pressure: 2469 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5069 ft. |
| IF:Weak to fair blow. 1 - 7"" in H20. ISI:No blow. FF:Fair to strong blow. Btm. of bucket in 85 mins. FSI:No blow. | |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
|
Recovery 75 of Total Fluid 75 of Fluid in Drill Pipe 310 of Gas in pipe. 75 of GCM 10%g 90%m 6000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 5194 to 5244
Formation tested: Miss | Date, Time: 28-FEB-98; 06:00:08 |
|
Initial Hydro Pressure: 2577 PSI
First Initial Flow Pressure: 100 PSI First Final Flow Pressure: 73 PSI Initial Shut-in Pressure: 417 PSI Second Initial Flow Pressure: 97 PSI Second Final Flow Pressure: 65 PSI Final Shut-in Pressure: 408 PSI Final Hydro Pressure: 2526 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5190 ft. |
| IF:Strong blow. GTS in 4 mins. (see gas volume report) ISI:No blow after 10 min. blow down. FF:Strong blow. (see gas volume report) FSI:As initial shut in. | |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 45 of Total Fluid 45 of Fluid in Drill Pipe 5150 of Gas in pipe. 45 of SGCM 3%g 97%m 8000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: | Data Source: TRILOBITE |
|
Interval: to
Formation tested: | Date, Time: 02-MAR-98; 20:26:37 |
|
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |