Drill Stem Tests Database
Specific Well--15-033-20968
API: 15-033-20968
Operator: R. J. Patrick Operating Co.
Field: Colter West
Lease: Herd
Well 2B-4
Location: T33S R19W, Sec. 4, N2 NE SE NE
1602 South, 327 West, from NE corner
Longitude: -99.3826841
Latitude: 37.2030528
County: Comanche
Status: GAS-P&A
Spud Date: 15-AUG-98
Completion Date: 26-AUG-88
Plugging Date: 01-JUN-12
Total Depth: 5340
Form. at depth: MISSISSIPPIAN
Elevation: 1939 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4970 to 5015
Formation tested: Pawnee
Date, Time: 23-AUG-98; 19:28:30
Initial Hydro Pressure: 2422 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 106 PSI
Initial Shut-in Pressure: 1672 PSI
Second Initial Flow Pressure: 65 PSI
Second Final Flow Pressure: 56 PSI
Final Shut-in Pressure: 1663 PSI
Final Hydro Pressure: 2405 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 352 ft.
Drill Pipe Length: 4632 ft.
Initial Flow: Bottom of bucket in 1 mins. strong blow Initial Shut-in: Bled 2"" no blow back
Final Flow: Bottom of bucket when tool open gas to surface in 10 mins. gas will burn
Final Shut-in: No blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples: yes
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of gas cut mud 20% Gas 80% mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.