Drill Stem Tests Database
Specific Well--15-033-20969
API: 15-033-20969
Operator: Thoroughbred Assoc., LLC
Field: Bird Northeast
Lease: Rietzke
Well 1
Location: T32S R19W, Sec. 21, N2 NE NW
330 South, 2074 East, from NW corner
Longitude: -99.3931937
Latitude: 37.2501253
County: Comanche
Status: O&G
Spud Date: 08/21/1998
Completion Date: 09/25/1998
Plugging Date:
Total Depth: 6164
Form. at depth: ARBUCKLE GROUP
Elevation: 1977 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4451 to 4496
Formation tested: Lansing E&F
Date, Time: 08/27/1998; 05:28:21
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4205 ft.
IFP-strong blow gas to surface in 3min. FFP-gas to surface
Bottom Hole Temperature: 107 DEG F
Percent Porosity:
Samples: gas sample bottle#88
Gas Recovery:
Comments:
Recovery
270 of Total Fluid
240 of Fluid in Drill Collars
30 of Fluid in Drill Pipe
270 of gas cut mud 25%gas 75%mud
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4985 to 5090
Formation tested: miss
Date, Time: 08/29/1998; 09:33:46
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4732 ft.
IFP-strong blow gas to surface in 4min. FFP-gas to surface
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
390 of Total Fluid
240 of Fluid in Drill Collars
150 of Fluid in Drill Pipe
150 of gas cut mud 15%gas 85%mud
240 of gas cut mud 30%gas 70%mud
View Pressures View Recovery Gas