|
API: 15-039-20907
Operator: Robuck Petroleum Co. Field: Monaghan North Lease: Bailey Well 1-11 |
Location: T2S R27W, Sec. 11, E2 NW SW
1980 North, 1100 East, from SW corner Longitude: -100.3240482 Latitude: 39.8917011 County: Decatur Status: D&A |
Spud Date: 03/21/1998
Completion Date: 03/26/1998 Plugging Date: 03/26/1998 Total Depth: 3740 Form. at depth: LANSING-KANSAS CITY Elevation: 2658 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3538 to 3576
Formation tested: L KC | Date, Time: 03/25/1998; 08:31:24 |
|
Initial Hydro Pressure: 1721 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 870 PSI Second Initial Flow Pressure: 39 PSI Second Final Flow Pressure: 52 PSI Final Shut-in Pressure: 825 PSI Final Hydro Pressure: 1667 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 479 ft. Drill Pipe Length: 3052 ft. |
| I.O.- 1/4""in. @ open slow build to a I.S.I.- No return F.F.- Bubble to open tool no blow F.S.I.- No return | |
|
Bottom Hole Temperature: 100 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of slitly water cut drilg mud 15%water 85%mud 21000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |