Drill Stem Tests Database
Specific Well--15-047-21437
API: 15-047-21437
Operator: Vincent Oil Corp.
Field: Sturgeon
Lease: Gamble
Well 1-33
Location: T26S R18W, Sec. 33, NW NE SE
2290 North, 930 West, from SE corner
Longitude: -99.2896859
Latitude: 37.7399546
County: Edwards
Status: OIL-P&A
Spud Date: 24-NOV-98
Completion Date: 30-NOV-98
Plugging Date: 01-DEC-98
Total Depth: 3364
Form. at depth: LANSING-KANSAS CITY
Elevation: 2186 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 2988 to 3055
Formation tested: Council grove
Date, Time: 28-NOV-98; 15:44:58
Initial Hydro Pressure: 1433 PSI
First Initial Flow Pressure: 81 PSI
First Final Flow Pressure: 177 PSI
Initial Shut-in Pressure: 1014 PSI
Second Initial Flow Pressure: 189 PSI
Second Final Flow Pressure: 261 PSI
Final Shut-in Pressure: 1011 PSI
Final Hydro Pressure: 1385 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 273 ft.
Drill Pipe Length: 2705 ft.
IF:Strong blow b.o.b in 1 min.G.T.S- 19 mins. ISI:Bled down for 10 mins.Biult to 8"". FF:Strong blow b.o.b in 30 sec gauge- gas. FSI:Bled down for 15 mins b.b.to b.o.b.- in 40 mins.
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
733 of Total Fluid
273 of Fluid in Drill Collars
460 of Fluid in Drill Pipe
250 of GCM 18%gas 2%water 80%mud
400 of GCWM 10%gas 40%water 50%mud
83 of SMCGW 24%gas 65%water 11%mud
2003 of gas in pipe
65000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3197 to 3286
Formation tested: Langdon sd.
Date, Time: 29-NOV-98; 17:18:21
Initial Hydro Pressure: 1522 PSI
First Initial Flow Pressure: 407 PSI
First Final Flow Pressure: 776 PSI
Initial Shut-in Pressure: 1043 PSI
Second Initial Flow Pressure: 778 PSI
Second Final Flow Pressure: 973 PSI
Final Shut-in Pressure: 1046 PSI
Final Hydro Pressure: 1470 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 273 ft.
Drill Pipe Length: 2982 ft.
IF:Strong blow b.o.b in 1 min G.T.S- in 5-1/2 mins. ISI:Bled down for sec. FF:Strong blow gauge gas. FSI:Bled down for entire shut in.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2236 of Total Fluid
273 of Fluid in Drill Collars
1963 of Fluid in Drill Pipe
252 of GCM 6%gas 94%mud
62 of gas pocket
62 of MCW 40% water 60%mud
124 of gas pocket
1862 of salt water
105000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.