|
API: 15-063-21528
Operator: SHIELDS OIL PRODUCERS INC. Field: Butterfield-Overland Lease: SHARP 'A' Well 1 |
Location: T14S R30W, Sec. 20, SW SW SW
330 North, 330 East, from SW corner Longitude: -100.6865474 Latitude: 38.8167561 County: Gove Status: OIL |
Spud Date: 17-DEC-98
Completion Date: 14-JAN-99 Plugging Date: Total Depth: 4550 Form. at depth: MISSISSIPPIAN Elevation: 2797 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4405 to 4475
Formation tested: FtScott/Cher/John | Date, Time: 02-JAN-99; 20:50:43 |
|
Initial Hydro Pressure: 2228 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 86 PSI Initial Shut-in Pressure: 988 PSI Second Initial Flow Pressure: 92 PSI Second Final Flow Pressure: 143 PSI Final Shut-in Pressure: 970 PSI Final Hydro Pressure: 2157 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: ft. |
| IF; Weak to fair blow off bttm in 25 mins. ISI; No retun blow FF; Weak to fair blow built to 10"" FSI; No return blow | |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 270 of Total Fluid 270 of Fluid in Drill Pipe 150 of GIP 150 of SGOCM 25%GAS 15%OIL 60%MUD 120 of SGOWCM 10%GAS 20%OIL 10%WTR 60%MUD | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4135 to 41550
Formation tested: L/KC 200' | Date, Time: 30-DEC-98; 10:16:22 |
|
Initial Hydro Pressure: 2113 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 141 PSI Initial Shut-in Pressure: 1027 PSI Second Initial Flow Pressure: 153 PSI Second Final Flow Pressure: 283 PSI Final Shut-in Pressure: 1014 PSI Final Hydro Pressure: 2073 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3387 ft. |
| IF; Surface blow built to 7"" ISI; No blow FF; Surface blow built to 5"" FSI; No blow | |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 570 of Total Fluid 570 of Fluid in Drill Pipe 150 of Muddy water 420 of Salt water 30000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4350 to 4380
Formation tested: Myrick Station | Date, Time: 01-JAN-99; 21:55:47 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3602 ft. |
| IF; Fair to strong blow off bottom in 1 min ISI; Surface blow return off bottom in 3 mins. FF; Fair to strong blow off bottom in 2 mins. FSI; Weak return built to bottom in 11 mins. | |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |