Drill Stem Tests Database
Specific Well--15-067-21443
API: 15-067-21443
Operator: ZINKE & TRUMBO
Field: Wildcat
Lease: Seaboard Farms
Well 1-15
Location: T30S R37W, Sec. 15, NE NW SW
2099 North, 1269 East, from SW corner
Longitude: -101.357352
Latitude: 37.4372204
County: Grant
Status: D&A
Spud Date: 02/27/1999
Completion Date: 03/14/1999
Plugging Date: 03/14/1999
Total Depth: 6146
Form. at depth: ST GENEVIEVE
Elevation: 3098 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5333 to 5426
Formation tested: Upper Morrow
Date, Time: 03/09/1999; 23:17:33
Initial Hydro Pressure: 2569 PSI
First Initial Flow Pressure: 901 PSI
First Final Flow Pressure: 1554 PSI
Initial Shut-in Pressure: 1652 PSI
Second Initial Flow Pressure: 1602 PSI
Second Final Flow Pressure: 1659 PSI
Final Shut-in Pressure: 1660 PSI
Final Hydro Pressure: 2374 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5396 ft.
Initial Flow: Strong-bottom of bucket in 2 min Initial Shutin: Bled off blow - no return
Final Flow: Strong bottom of bucket in 5 minutes for 30 minutes then decreasing to weak 4"" blow before shutin:
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
3355 of Total Fluid
3355 of Fluid in Drill Pipe
400 of Water cut mud 20% water 80% mud
2955 of Salt water
95000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5646 to 5774
Formation tested: Lwr Morrow
Date, Time: 03/11/1999; 22:30:26
Initial Hydro Pressure: 2793 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 109 PSI
Second Initial Flow Pressure: 30 PSI
Second Final Flow Pressure: 73 PSI
Final Shut-in Pressure: 105 PSI
Final Hydro Pressure: 2610 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5634 ft.
Initial Flow: Weak 1/4"" blow died @ 25 mins
Final Flow: No return blow
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
10 of Drilling mud
4800 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5970 to 6012
Formation tested: St Louis
Date, Time: 03/12/1999; 17:31:18
Initial Hydro Pressure: 2818 PSI
First Initial Flow Pressure: 38 PSI
First Final Flow Pressure: 112 PSI
Initial Shut-in Pressure: 1142 PSI
Second Initial Flow Pressure: 117 PSI
Second Final Flow Pressure: 160 PSI
Final Shut-in Pressure: 966 PSI
Final Hydro Pressure: 2770 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 5855 ft.
Initial Flow: Surface blow slowly built to 8"" Initial Shut-in: No return blow
Final Flow: Steady 1/2"" blow throughout
Final Shut-in: No return blow
Bottom Hole Temperature: 137 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
310 of Total Fluid
120 of Fluid in Drill Collars
190 of Fluid in Drill Pipe
130 of Water mud 40% water 60% mud
180 of Water
36000 of Salinity (PPM)
View Pressures No Recovery Gas data.