API: 15-067-21444
Operator: ZINKE & TRUMBO Field: Wildcat Lease: Boldt Well 1-6 |
Location: T30S R36W, Sec. 6, N2 SW SE
1173 North, 1951 West, from SE corner Longitude: -101.2954476 Latitude: 37.4634632 County: Grant Status: D&A |
Spud Date: 18-MAR-99
Completion Date: 01-APR-99 Plugging Date: 02-APR-99 Total Depth: 6078 Form. at depth: ST GENEVIEVE Elevation: 3070 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5371 to 5408
Formation tested: Upper Morrow | Date, Time: 28-MAR-99; 01:46:21 |
Initial Hydro Pressure: 2622 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 372 PSI Second Initial Flow Pressure: 50 PSI Second Final Flow Pressure: 48 PSI Final Shut-in Pressure: 113 PSI Final Hydro Pressure: 2532 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 659 ft. Drill Pipe Length: 4692 ft. |
Initial Flow: Weak surface blow died in 25 mins. Final Flow: No return blow. |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Drilling mud 2400 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5908 to 59550
Formation tested: St Louis | Date, Time: 31-MAR-99; 09:13:23 |
Initial Hydro Pressure: 2849 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 120 PSI Initial Shut-in Pressure: 1713 PSI Second Initial Flow Pressure: 126 PSI Second Final Flow Pressure: 195 PSI Final Shut-in Pressure: 1708 PSI Final Hydro Pressure: 2746 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 659 ft. Drill Pipe Length: 5256 ft. |
Initial Flow: Weak to fair blow built to 6"" Initial Shut-in: No return blow Final Flow: Steady 1/2"" blow throughout Final Shut-in: No return blow |
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 360 of Total Fluid 360 of Fluid in Drill Collars 180 of Water mud 20% water 80% mud 180 of Water 34000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |