Drill Stem Tests Database
Specific Well--15-067-21444
API: 15-067-21444
Operator: ZINKE & TRUMBO
Field: Wildcat
Lease: Boldt
Well 1-6
Location: T30S R36W, Sec. 6, N2 SW SE
1173 North, 1951 West, from SE corner
Longitude: -101.2954476
Latitude: 37.4634632
County: Grant
Status: D&A
Spud Date: 18-MAR-99
Completion Date: 01-APR-99
Plugging Date: 02-APR-99
Total Depth: 6078
Form. at depth: ST GENEVIEVE
Elevation: 3070 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5371 to 5408
Formation tested: Upper Morrow
Date, Time: 28-MAR-99; 01:46:21
Initial Hydro Pressure: 2622 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 36 PSI
Initial Shut-in Pressure: 372 PSI
Second Initial Flow Pressure: 50 PSI
Second Final Flow Pressure: 48 PSI
Final Shut-in Pressure: 113 PSI
Final Hydro Pressure: 2532 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 659 ft.
Drill Pipe Length: 4692 ft.
Initial Flow: Weak surface blow died in 25 mins.
Final Flow: No return blow.
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Pipe
20 of Drilling mud
2400 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5908 to 59550
Formation tested: St Louis
Date, Time: 31-MAR-99; 09:13:23
Initial Hydro Pressure: 2849 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 120 PSI
Initial Shut-in Pressure: 1713 PSI
Second Initial Flow Pressure: 126 PSI
Second Final Flow Pressure: 195 PSI
Final Shut-in Pressure: 1708 PSI
Final Hydro Pressure: 2746 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 659 ft.
Drill Pipe Length: 5256 ft.
Initial Flow: Weak to fair blow built to 6"" Initial Shut-in: No return blow
Final Flow: Steady 1/2"" blow throughout
Final Shut-in: No return blow
Bottom Hole Temperature: 135 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
360 of Total Fluid
360 of Fluid in Drill Collars
180 of Water mud 20% water 80% mud
180 of Water
34000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.