Drill Stem Tests Database
Specific Well--15-071-20686
API: 15-071-20686
Operator: RICKS EXPLORATION INC
Field: Sidney South
Lease: HIBBERT 'A'
Well 23
Location: T16S R42W, Sec. 23, S2 NW SE
1708 North, 2127 West, from SE corner
Longitude: -101.9269531
Latitude: 38.6445869
County: Greeley
Status: D&A
Spud Date: 17-APR-98
Completion Date: 26-APR-98
Plugging Date: 26-APR-98
Total Depth: 5196
Form. at depth: KEARNY FORMATION
Elevation: 3797 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4970 to 5073
Formation tested: Morrow
Date, Time: 24-APR-98; 19:33:15
Initial Hydro Pressure: 2385 PSI
First Initial Flow Pressure: 570 PSI
First Final Flow Pressure: 977 PSI
Initial Shut-in Pressure: 1005 PSI
Second Initial Flow Pressure: 1006 PSI
Second Final Flow Pressure: 1007 PSI
Final Shut-in Pressure: 1008 PSI
Final Hydro Pressure: 2339 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 559 ft.
Drill Pipe Length: 4409 ft.
IF; Strong blow off bttm in 1 min ISI; No return blow FF; No blow back FSI; No return blow
Bottom Hole Temperature: 134 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2029 of Total Fluid
559 of Fluid in Drill Collars
1470 of Fluid in Drill Pipe
480 of GMCW 40%gas trc.oil 40%wtr 20%mud
540 of GOWCM 48%gas 2%oil 20%wtr 30%mud
1009 of GOMCW 55%gas 8%oil 23%wtr 10%mud
44000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.