Drill Stem Tests Database
Specific Well--15-075-20693
API: 15-075-20693
Operator: Gulf Production Corp.
Field: Wildcat
Lease: Burnett
Well 13-14
Location: T21S R39W, Sec. 14, NW SW SW
990 North, 330 East, from SW corner
Longitude: -101.5772788
Latitude: 38.2224964
County: Hamilton
Status: D&A
Spud Date: 31-DEC-98
Completion Date: 10-JAN-99
Plugging Date: 11-JAN-99
Total Depth: 5410
Form. at depth: MISSISSIPPIAN
Elevation: 3459 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4940 to 5030
Formation tested: upper morrow
Date, Time: 08-JAN-99; 08:03:15
Initial Hydro Pressure: 2539 PSI
First Initial Flow Pressure: 46 PSI
First Final Flow Pressure: 54 PSI
Initial Shut-in Pressure: 474 PSI
Second Initial Flow Pressure: 57 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 800 PSI
Final Hydro Pressure: 2474 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 560 ft.
Drill Pipe Length: 4444 ft.
Initial Flow: 3/4"" at open built to 1 1/4"" Initial Shut-in: No return
Final Flow: Weak surface blow built to 1/4""
Final Shut-in: No return
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of drilling mud 100% mud
5200 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4280 to 4314
Formation tested: miss.
Date, Time: 11-JAN-99; 05:22:31
Initial Hydro Pressure: 2681 PSI
First Initial Flow Pressure: 41 PSI
First Final Flow Pressure: 182 PSI
Initial Shut-in Pressure: 1225 PSI
Second Initial Flow Pressure: 197 PSI
Second Final Flow Pressure: 384 PSI
Final Shut-in Pressure: 1237 PSI
Final Hydro Pressure: 2557 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 560 ft.
Drill Pipe Length: 4815 ft.
Initial Flow: 1/4"" at open built to 10"" Initial Shut-in: Bled off for 1 1/2"" min. No return
Final Flow: Surface blow built to bottom of bucket in 22 1/2 min.
Final Shut-in: Bled off for 4 min. No return.
Bottom Hole Temperature: 141 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
810 of Total Fluid
470 of Fluid in Drill Collars
340 of Fluid in Drill Pipe
60 of slightly water cut mud 15% water 85% mud
180 of muddy water 70% water 30% mud
570 of water 100% water
33000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.