Drill Stem Tests Database
Specific Well--15-081-21042
API: 15-081-21042
Operator: Amoco Production Co.
Field: Victory
Lease: Megan Janae
Well 1-30
Location: T30S R33W, Sec. 30, SE SE
660 North, 710 West, from SE corner
Longitude: -100.9639406
Latitude: 37.4041107
County: Haskell
Status: OIL
Spud Date: 06-AUG-96
Completion Date: 04-SEP-96
Plugging Date:
Total Depth: 5660
Form. at depth: MISSISSIPPIAN
Elevation: 2956 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4085 to 4120
Formation tested: Lansing ""A""
Date, Time: 11-AUG-96; 03:44:56
Initial Hydro Pressure: 1921 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 47 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 23 PSI
Final Shut-in Pressure: 47 PSI
Final Hydro Pressure: 1893 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 690 ft.
Drill Pipe Length: 3398 ft.
Initial Flow - Weak surface blow, died in 6.5 min
Initial Shutin - No blow back
Final Flow - No blow
Final Shutin - No blow back
Bottom Hole Temperature: 113 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
4088 of Total Fluid
690 of Fluid in Drill Collars
3398 of Fluid in Drill Pipe
4088 of Mud - 100% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4144 to 4170
Formation tested: Lansing ""Upper B""
Date, Time: 12-AUG-96; 00:40:10
Initial Hydro Pressure: 1778 PSI
First Initial Flow Pressure: 281 PSI
First Final Flow Pressure: 571 PSI
Initial Shut-in Pressure: 853 PSI
Second Initial Flow Pressure: 600 PSI
Second Final Flow Pressure: 750 PSI
Final Shut-in Pressure: 856 PSI
Final Hydro Pressure: 1720 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 334 ft.
Drill Pipe Length: 3786 ft.
Initial Flow - Bottom of bucket in 1 min, faint gas odor in 10 min, very strong blow
Initial Shutin - Bled off, blew back immediately, bottom of bucket in 17 min
Final Flow - Bled off, bottom of bucket in 3.5 min, gas odor, very strong blow
Final Shutin - Bled off, bottom of bucket in 9 min
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
1810 of Total Fluid
334 of Fluid in Drill Collars
1476 of Fluid in Drill Pipe
50 of Gassy mud & oil cut water -
485 of Oil specked gassy mud cut water -
1275 of Slightly gassy oil specked mud cut water -
19000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4540 to 4579
Formation tested: Kansas City
Date, Time: 13-AUG-96; 10:11:31
Initial Hydro Pressure: 2182 PSI
First Initial Flow Pressure: 91 PSI
First Final Flow Pressure: 98 PSI
Initial Shut-in Pressure: 1014 PSI
Second Initial Flow Pressure: 82 PSI
Second Final Flow Pressure: 107 PSI
Final Shut-in Pressure: 982 PSI
Final Hydro Pressure: 2124 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 4192 ft.
Initial Flow - Bottom of bucket in .5 min; Gas to surface in 4 min
Initial Shutin - Bled off, went to bottom of bucket in 2.5 min, backed off to 1.25"" in 51 min
Final Flow - Gauged gas
Final Shutin - Bled off, went to bottom of bucket in 3 min, backed off to .75"" over 84 min
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples: Yes
Gas Recovery:
Comments:
Recovery
375 of Total Fluid
336 of Fluid in Drill Collars
39 of Fluid in Drill Pipe
10 of Gassy slightly watery mud -
60 of Gassy oil specked watery mud -
245 of Gassy mud cut oil & water -
60 of Gassy mud & oil cut water -
21000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4969 to 5008
Formation tested: Cherokee
Date, Time: 15-AUG-96; 07:04:51
Initial Hydro Pressure: 2392 PSI
First Initial Flow Pressure: 96 PSI
First Final Flow Pressure: 163 PSI
Initial Shut-in Pressure: 1277 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 83 PSI
Final Shut-in Pressure: 1224 PSI
Final Hydro Pressure: 2321 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 336 ft.
Drill Pipe Length: 4630 ft.
Initial Flow - Weak to fair blow, surging, built to 6"" in 11 min, fell back to 4.5"" by shutin
Initial Shutin - Bled off, no blow back
Final Flow - Built to 6"" in 18 min, then backed off slowly to 1.25"" by the shutin
Final Shutin - Bled off, no blow back
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
300 of Gas in pipe
5 of Slightly oil cut mud - 4% oil, 96% mud
60 of Gassy oil cut watery mud -
60 of Slightly oil cut muddy water -
23000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5550 to 5572
Formation tested: St.Louis
Date, Time: 19-AUG-96; 01:57:02
Initial Hydro Pressure: 2697 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 1477 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 49 PSI
Final Shut-in Pressure: 1482 PSI
Final Hydro Pressure: 2602 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 690 ft.
Drill Pipe Length: 4847 ft.
Initial Flow - Weak surface blow, died in 8 min.
Initial Shutin - No blow back
Final Flow - Weak building to steady blow, bottom of bucket in 33 min
Final Shutin - Bled off, no blow back
Bottom Hole Temperature: 136 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Collars
880 of Gas in pipe
20 of Oil cut mud - 20% oil, 80% mud
60 of Gassy oil cut mud - 50% gas, 15% oil, 35% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.