Drill Stem Tests Database
Specific Well--15-081-21188
API: 15-081-21188
Operator:
Field: Eubank
Lease: MLP Black
Well 7-3
Location: T30S R34W, Sec. 3, SE NW SW
1653 North, 4533 West, from SE corner
Longitude: -101.031813
Latitude: 37.4650037
County: Haskell
Status: GAS-P&A
Spud Date: 10-MAR-98
Completion Date: 27-MAR-98
Plugging Date: 25-OCT-18
Total Depth: 5608
Form. at depth: MISSISSIPPIAN
Elevation: 2987 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5182 to 5301
Formation tested: morrow
Date, Time: 17-MAR-98; 22:01:59
Initial Hydro Pressure: 2619 PSI
First Initial Flow Pressure: 47 PSI
First Final Flow Pressure: 69 PSI
Initial Shut-in Pressure: 881 PSI
Second Initial Flow Pressure: 73 PSI
Second Final Flow Pressure: 107 PSI
Final Shut-in Pressure: 823 PSI
Final Hydro Pressure: 2518 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 246 ft.
Drill Pipe Length: 5017 ft.
I.O.- B.O.B. in 21 min. I.S.I.- Bleed off for 2 min. no return. F.F.- B.O.B. @ open F.S.I.- Bleed off for 2 min. no return.
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
140 of Total Fluid
140 of Fluid in Drill Collars
20 of slightly gassy drilling mud 5%gas 95%mud
120 of slightly gassy drilling mud w/trace of oil
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 53180 to 5384
Formation tested: chester
Date, Time: 18-MAR-98; 21:32:26
Initial Hydro Pressure: 2591 PSI
First Initial Flow Pressure: 400 PSI
First Final Flow Pressure: 609 PSI
Initial Shut-in Pressure: 1120 PSI
Second Initial Flow Pressure: 493 PSI
Second Final Flow Pressure: 693 PSI
Final Shut-in Pressure: 1116 PSI
Final Hydro Pressure: 2572 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 246 ft.
Drill Pipe Length: 5117 ft.
I.O.- B.O.B in 1/2 min. G.T.S. in 5 min I.S.I.- Bleed off for 42 min. weak surf- F.F.- B.O.B. @ open , gauging gas F.S.I.- Bleed off for 48 min. no return
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
371 of Total Fluid
246 of Fluid in Drill Collars
125 of Fluid in Drill Pipe
371 of gassy drilg mud 40% gas 60% mud
1600 of Salinity (PPM)
View Pressures View Recovery Gas