API: 15-081-21216
Operator: Field: Eubank Southeast Lease: MLP Black Well 8-3 |
Location: T30S R34W, Sec. 3, SW SW NW
2157 South, 455 East, from NW corner Longitude: -101.0331588 Latitude: 37.4692057 County: Haskell Status: OIL-P&A |
Spud Date: 25-SEP-98
Completion Date: 22-OCT-98 Plugging Date: 13-APR-10 Total Depth: 5575 Form. at depth: ST. GENEVIEVE LIMESTONE Elevation: 2984 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5320 to 5426
Formation tested: chester | Date, Time: 03-OCT-98; 15:22:14 |
Initial Hydro Pressure: 2511 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 103 PSI Initial Shut-in Pressure: 343 PSI Second Initial Flow Pressure: 89 PSI Second Final Flow Pressure: 120 PSI Final Shut-in Pressure: 348 PSI Final Hydro Pressure: 2467 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 275 ft. Drill Pipe Length: 5030 ft. |
Fair blow B.O.B. in 6 min. built to strong blow I.S. no blow back B.O.B. as soon as tool open GTS in 25 min. gas will burn. no blow back | |
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 15 Samples: Gas Recovery: Comments: | |
Recovery 300 of Total Fluid 275 of Fluid in Drill Collars 25 of Fluid in Drill Pipe 300 of gas cut mud 5%gas 95%mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5435 to 5456
Formation tested: Chester | Date, Time: 04-OCT-98; 12:30:01 |
Initial Hydro Pressure: 2567 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 84 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 40 PSI Final Shut-in Pressure: 46 PSI Final Hydro Pressure: 2530 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 275 ft. Drill Pipe Length: 5152 ft. |
Weak surface blow 1/8"" intermitent no blow back 2nd open no blow | |
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1 of Total Fluid 1 of Fluid in Drill Collars 1 of mud 100% | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |