API: 15-081-21224
Operator: Field: Eubank Lease: MLP MURPHY Well 1-3 |
Location: T30S R34W, Sec. 3, W2 SE NE
2040 South, 990 West, from NE corner Longitude: -101.0195845 Latitude: 37.4694738 County: Haskell Status: OIL-P&A |
Spud Date: 16-NOV-98
Completion Date: 19-DEC-98 Plugging Date: 26-AUG-02 Total Depth: 5530 Form. at depth: MISSISSIPPIAN Elevation: 2999 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5230 to 5342
Formation tested: Morrow | Date, Time: 26-NOV-98; 13:50:15 |
Initial Hydro Pressure: 2525 PSI
First Initial Flow Pressure: 84 PSI First Final Flow Pressure: 153 PSI Initial Shut-in Pressure: 1574 PSI Second Initial Flow Pressure: 158 PSI Second Final Flow Pressure: 206 PSI Final Shut-in Pressure: 1511 PSI Final Hydro Pressure: 2491 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249 ft. Drill Pipe Length: 4967 ft. |
Strong, OBB in 1 min. Cracked 2"". De- creased slightly in 30 min. I.F.P. No blow-back. I.S.I.P. Strong, OBB in 30 sec. GTS in 2 min. Guaged 23,700 CFPD. Decreased to 14, 100 CFPD in 45 min. F.F.P. No blow-back. F.S.I.P. | |
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 570 of Total Fluid 249 of Fluid in Drill Collars 321 of Fluid in Drill Pipe 4646 of GIP 135 of Oil & Gas cut Mud 8%G 8%O 84%M 105 of Oil cut Gassy Mud 53%G 15%O 32%M 205 of Cln Gassy Oil 50%G 50%O 125 of Sli Mud cut Gassy Oil 50%G 40%O 10%M 1950 of Salinity (PPM) 41 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5362 to 5419
Formation tested: Chester | Date, Time: 27-NOV-98; 15:25:12 |
Initial Hydro Pressure: 2574 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2568 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249 ft. Drill Pipe Length: 5091 ft. |
Miss-run ""Packer Failure"" | |
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 385 of Total Fluid 249 of Fluid in Drill Collars 136 of Fluid in Drill Pipe 385 of Driiling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5230 to 5401
Formation tested: Morrow/Chester | Date, Time: 29-NOV-98; 11:20:08 |
Initial Hydro Pressure: 2551 PSI
First Initial Flow Pressure: 114 PSI First Final Flow Pressure: 188 PSI Initial Shut-in Pressure: 1450 PSI Second Initial Flow Pressure: 151 PSI Second Final Flow Pressure: 240 PSI Final Shut-in Pressure: 1504 PSI Final Hydro Pressure: 2448 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249 ft. Drill Pipe Length: 4967 ft. |
Fair 3"", built to strong, OBB in 6 min. Cracked 2"" slightly. I.F.P. 1"" blow-back. I.S.I.P. Strong, OBB immed. GTS in 31 min. Guag- ed 5,050 CFPD. F.F.P. 1"" blow-back. F.S.I.P. Remark: Lost 15 ft. of mud when tool opened. | |
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
Recovery 575 of Total Fluid 249 of Fluid in Drill Collars 326 of Fluid in Drill Pipe 4641 of GIP 75 of Sli Gas cut Mud 3%G 97%M 125 of Sli O&G cut Mud 3%G 3%O 94%M 375 of Mud cut Gassy Oil 46%G 30%O 24%M 1650 of Salinity (PPM) 41 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |