Drill Stem Tests Database
Specific Well--15-081-21230
API: 15-081-21230
Operator: Chesapeake Operating, LLC
Field: Eubank
Lease: MLP Leslie
Well 1-26
Location: T29S R34W, Sec. 26, NW NE SE SE
1177 North, 350 West, from SE corner
Longitude: -100.999406
Latitude: 37.4928352
County: Haskell
Status: OIL
Spud Date: 01-DEC-98
Completion Date: 27-JAN-99
Plugging Date:
Total Depth: 5585
Form. at depth: MISSISSIPPIAN
Elevation: 2981 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5220 to 5345
Formation tested: Morrow
Date, Time: 09-DEC-98; 06:26:09
Initial Hydro Pressure: 2524 PSI
First Initial Flow Pressure: 86 PSI
First Final Flow Pressure: 156 PSI
Initial Shut-in Pressure: 1276 PSI
Second Initial Flow Pressure: 158 PSI
Second Final Flow Pressure: 215 PSI
Final Shut-in Pressure: 1176 PSI
Final Hydro Pressure: 2398 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4969 ft.
Weak 1"", built to strong, OBB in 2 min. Cracked 2"". I.F.P. 8"" blow-back. I.S.I.P. Strong, OBB in 30 sec. GTS in 4 min. Guaged 19,900 CFPD. F.F.P. No blow-back. F.S.I.P. Remark: Gas burned.
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
575 of Total Fluid
248 of Fluid in Drill Collars
327 of Fluid in Drill Pipe
4642 of GIP
75 of Sli Gas cut Mud 4%G 96%M
125 of Oil & Gas cut Mud 14%G 18%O 68%M
250 of Gassy Mud cut Oil 22%G 60%O 18%M
125 of Sli Mud cut Gassy Oil 25%G 67%O 8%M
41 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.