Drill Stem Tests Database
Specific Well--15-083-21456
API: 15-083-21456
Operator: ENERSTAR RESOURCES LC
Field: Sebes West
Lease: Korf
Well 2
Location: T23S R22W, Sec. 7, SE SE
676 North, 754 West, from SE corner
Longitude: -99.77323
Latitude: 38.06016
County: Hodgeman
Status: OIL-P&A
Spud Date: 13-APR-98
Completion Date: 13-APR-98
Plugging Date: 15-SEP-08
Total Depth: 4516
Form. at depth: MISSISSIPPIAN
Elevation: 2261 KB
Newer op Pintail Petroleum.

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4460 to 4500
Formation tested: Mississippi
Date, Time: 21-APR-98; 02:43:04
Initial Hydro Pressure: 2232 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2136 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4446 ft.
Initial Flow- weak 1' blow decreasing to surface blow lost packer seat minutes before end of flow
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
4370 of Total Fluid
4370 of Fluid in Drill Pipe
4370 of mud
View Pressures No Recovery Gas data.