Drill Stem Tests Database
Specific Well--15-093-21635
API: 15-093-21635
Operator: Lebsack Oil Production Inc.
Field: Christabelle
Lease: Foster 'D'
Well 3
Location: T21S R35W, Sec. 14, S2 NE
1980 South, 1320 West, from NE corner
Longitude: -101.1259198
Latitude: 38.2298498
County: Kearny
Status: OIL-P&A
Spud Date: 19-OCT-98
Completion Date: 28-OCT-98
Plugging Date: 22-SEP-99
Total Depth: 5010
Form. at depth: MISSISSIPPIAN
Elevation: 3109 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4900 to 5010
Formation tested: Morrow
Date, Time: 26-OCT-98; 21:48:16
Initial Hydro Pressure: 2407 PSI
First Initial Flow Pressure: 57 PSI
First Final Flow Pressure: 202 PSI
Initial Shut-in Pressure: 515 PSI
Second Initial Flow Pressure: 205 PSI
Second Final Flow Pressure: 279 PSI
Final Shut-in Pressure: 514 PSI
Final Hydro Pressure: 2388 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 179 ft.
Drill Pipe Length: 4725 ft.
Weak 2"", built to strong OBB in 25 min. I.F.P. No blow-back. I.S.I.P. Surface blow, built to 10"" in bucket. 60 min. F.F.P. No blow-back. F.S.I.P.
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 17
Samples: None
Gas Recovery:
Comments:
Recovery
550 of Total Fluid
179 of Fluid in Drill Collars
371 of Fluid in Drill Pipe
60 of GIP
5 of Cln Oil 100%O
30 of Mud cut Wtr w/scum of Oil 62%W 38%M
275 of Wtr w/scum of Oil 100%W
60 of Wtr cut Mud w/scum of Oil 30%W 70%M
180 of Wtr 100%W
37000 of Salinity (PPM)
28 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4898 to 4920
Formation tested: Morrow
Date, Time: 27-OCT-98; 09:08:14
Initial Hydro Pressure: 2403 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2392 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 179 ft.
Drill Pipe Length: 4724 ft.
Miss-run: Packer Failure.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 17
Samples: None
Gas Recovery:
Comments:
Recovery
260 of Total Fluid
179 of Fluid in Drill Collars
81 of Fluid in Drill Pipe
260 of Mud 100%M
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4847 to 4920
Formation tested: Morrow
Date, Time: 27-OCT-98; 14:36:13
Initial Hydro Pressure: 2392 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 91 PSI
Initial Shut-in Pressure: 362 PSI
Second Initial Flow Pressure: 90 PSI
Second Final Flow Pressure: 95 PSI
Final Shut-in Pressure: 464 PSI
Final Hydro Pressure: 2318 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 179 ft.
Drill Pipe Length: 4662 ft.
1/2"" built to 2""in 5 min. De-creased to 3/4"" in 60 min. I.F.P. No blow-back. I.S.I.P. No blow. F.F.P. No blow-back. F.S.I.P.
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 17
Samples: None
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Mud 100%M
3300 of Salinity (PPM)
View Pressures No Recovery Gas data.