Drill Stem Tests Database
Specific Well--15-095-21744
API: 15-095-21744
Operator: MTM PET
Field: Spivey Grabs
Lease: GRABER 'B'
Well 1
Location: T29S R7W, Sec. 21, W2 E2 SE
1465 North, 1070 West, from SE corner
Longitude: -98.0845362
Latitude: 37.5057313
County: Kingman
Status: GAS-P&A
Spud Date: 02/09/1998
Completion Date: 04/07/1998
Plugging Date: 04/02/2001
Total Depth: 4517
Form. at depth: MISSISSIPPIAN
Elevation: 1547 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4110 to 4135
Formation tested: Miss.
Date, Time: 02/14/1998; 00:48:31
Initial Hydro Pressure: 2083 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 29 PSI
Initial Shut-in Pressure: 465 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 433 PSI
Final Hydro Pressure: 1832 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4096 ft.
IF:Strong blow.B.O.B ISI:Bled down in under 2 mins FF:Strong blow.B.O.B small to measure FSI:Bled down 3 mins
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
35 of VSGCM 99%mud less than 1% gas
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4497 to 4511
Formation tested: Simpson
Date, Time: 02/16/1998; 23:54:26
Initial Hydro Pressure: 2221 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 31 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 26 PSI
Final Hydro Pressure: 2182 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4500 ft.
IF:Weak blow.Built to 1-1/2 ins. ISI:No b.b. FF:No blow.Flush tool.Dead blow. FSI:No b.b.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
10 of VSOCM 94%mud 6%oil
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4507 to 4517
Formation tested: Simpson
Date, Time: 02/17/1998; 11:45:31
Initial Hydro Pressure: 2264 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 1651 PSI
Second Initial Flow Pressure: 30 PSI
Second Final Flow Pressure: 35 PSI
Final Shut-in Pressure: 1508 PSI
Final Hydro Pressure: 2077 PSI
Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4507 ft.
IF;Weak blow.Built to 7-1/2 ins. ISI;Bled down for 5 mins.No b.b. FF;Fair blow.Built to 5 ins. FSI;Bled down for 3 mins.No b.b.
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
50 of Total Fluid
50 of Fluid in Drill Pipe
50 of SO@GCM 16%gas 8%oil 6%water 70%mud
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4000 to 4125
Formation tested: Miss.
Date, Time: 02/18/1998; 01:49:59
Initial Hydro Pressure: 1997 PSI
First Initial Flow Pressure: 202 PSI
First Final Flow Pressure: 364 PSI
Initial Shut-in Pressure: 1672 PSI
Second Initial Flow Pressure: 411 PSI
Second Final Flow Pressure: 571 PSI
Final Shut-in Pressure: 1573 PSI
Final Hydro Pressure: 1817 PSI
Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4471 ft.
IF;Strong blow.B.O.B in 1 mins.. ISI;Bled down for 3 mins.No b.b. FF;Strong Blow.built to B.O.B in 5 mins. FSI;Bled down for 3 mins.No b.b.
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1200 of Total Fluid
1200 of Fluid in Drill Pipe
800 of VSGCM 2%gas 98% mud
400 of GCWM 10%gas 30%water 60%mud
20000 of Salinity (PPM)
View Pressures No Recovery Gas data.