API: 15-095-21744
Operator: MTM PET Field: Spivey Grabs Lease: GRABER 'B' Well 1 |
Location: T29S R7W, Sec. 21, W2 E2 SE
1465 North, 1070 West, from SE corner Longitude: -98.0845362 Latitude: 37.5057313 County: Kingman Status: GAS-P&A |
Spud Date: 09-FEB-98
Completion Date: 07-APR-98 Plugging Date: 02-APR-01 Total Depth: 4517 Form. at depth: MISSISSIPPIAN Elevation: 1547 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4110 to 4135
Formation tested: Miss. | Date, Time: 14-FEB-98; 00:48:31 |
Initial Hydro Pressure: 2083 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 465 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 433 PSI Final Hydro Pressure: 1832 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4096 ft. |
IF:Strong blow.B.O.B ISI:Bled down in under 2 mins FF:Strong blow.B.O.B small to measure FSI:Bled down 3 mins | |
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 35 of Total Fluid 35 of Fluid in Drill Pipe 35 of VSGCM 99%mud less than 1% gas | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4497 to 4511
Formation tested: Simpson | Date, Time: 16-FEB-98; 23:54:26 |
Initial Hydro Pressure: 2221 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 31 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 26 PSI Final Hydro Pressure: 2182 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4500 ft. |
IF:Weak blow.Built to 1-1/2 ins. ISI:No b.b. FF:No blow.Flush tool.Dead blow. FSI:No b.b. | |
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of VSOCM 94%mud 6%oil | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4507 to 4517
Formation tested: Simpson | Date, Time: 17-FEB-98; 11:45:31 |
Initial Hydro Pressure: 2264 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 1651 PSI Second Initial Flow Pressure: 30 PSI Second Final Flow Pressure: 35 PSI Final Shut-in Pressure: 1508 PSI Final Hydro Pressure: 2077 PSI |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4507 ft. |
IF;Weak blow.Built to 7-1/2 ins. ISI;Bled down for 5 mins.No b.b. FF;Fair blow.Built to 5 ins. FSI;Bled down for 3 mins.No b.b. | |
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 50 of Total Fluid 50 of Fluid in Drill Pipe 50 of SO@GCM 16%gas 8%oil 6%water 70%mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4000 to 4125
Formation tested: Miss. | Date, Time: 18-FEB-98; 01:49:59 |
Initial Hydro Pressure: 1997 PSI
First Initial Flow Pressure: 202 PSI First Final Flow Pressure: 364 PSI Initial Shut-in Pressure: 1672 PSI Second Initial Flow Pressure: 411 PSI Second Final Flow Pressure: 571 PSI Final Shut-in Pressure: 1573 PSI Final Hydro Pressure: 1817 PSI |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4471 ft. |
IF;Strong blow.B.O.B in 1 mins.. ISI;Bled down for 3 mins.No b.b. FF;Strong Blow.built to B.O.B in 5 mins. FSI;Bled down for 3 mins.No b.b. | |
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1200 of Total Fluid 1200 of Fluid in Drill Pipe 800 of VSGCM 2%gas 98% mud 400 of GCWM 10%gas 30%water 60%mud 20000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |