API: 15-109-20673
Operator: PELICAN HILL OIL & GAS INC Field: Cook South Lease: Bertrand Well 1 |
Location: T11S R33W, Sec. 26, NE NE SW NW
3870 North, 4205 West, from SE corner Longitude: -100.9572022 Latitude: 39.0716703 County: Logan Status: OIL |
Spud Date: 18-AUG-98
Completion Date: 26-AUG-98 Plugging Date: Total Depth: 4750 Form. at depth: MISSISSIPPIAN Elevation: 3139 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4603 to 4650
Formation tested: johnson | Date, Time: 25-AUG-98; 16:58:55 |
Initial Hydro Pressure: 2336 PSI
First Initial Flow Pressure: 64 PSI First Final Flow Pressure: 195 PSI Initial Shut-in Pressure: 1000 PSI Second Initial Flow Pressure: 210 PSI Second Final Flow Pressure: 394 PSI Final Shut-in Pressure: 942 PSI Final Hydro Pressure: 2176 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.5 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4593 ft. |
I.O.- B.O.B in 3 1/2 min. I.S.I.- Bleed off for 1 min. return in F.F.- B.O.B. @ open F.S.I- Bleed off for 1 1/2min. return | |
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1030 of Total Fluid 30 of Fluid in Drill Collars 1000 of Fluid in Drill Pipe 910 of clean gassy heavy oil 30%gas 70%oil 120 of slitly mud cut gassy heavy oil 35%gas 55%oil 1610 of gas in pipe 22 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4278 to 4308
Formation tested: J"" | Date, Time: 23-AUG-98; 11:02:21 |
Initial Hydro Pressure: 2144 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 59 PSI Initial Shut-in Pressure: 420 PSI Second Initial Flow Pressure: 60 PSI Second Final Flow Pressure: 107 PSI Final Shut-in Pressure: 418 PSI Final Hydro Pressure: 2052 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4256 ft. |
Initial Flow: Surface blow built to 5 1/2"" Initial Shut-in: No return Final Flow: Surface blow in 2 mins. built to 5"" Final Shut-in: No return |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 195 of Total Fluid 30 of Fluid in Drill Collars 165 of Fluid in Drill Pipe 75 of mud cut water 40% mud 60% water W/oil spots 120 of slightly mud cut water 15% mud 85%water 15 of gas in pipe 43500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |