API: 15-135-24066
Operator: Western Interior Energy, Inc. Field: Wildcat Lease: Jones Estate Well 1-4 |
Location: T18S R24W, Sec. 4, E2 W2 NW
1320 South, 1100 East, from NW corner Longitude: -99.9875846 Latitude: 38.5189984 County: Ness Status: D&A |
Spud Date: 18-NOV-98
Completion Date: 26-NOV-98 Plugging Date: 26-NOV-98 Total Depth: 4454 Form. at depth: MISSISSIPPIAN Elevation: 2340 KB |
DST marked 2337 KB. --cb 12/19/01 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4292 to 4339
Formation tested: Cherokee | Date, Time: 24-NOV-98; 08:24:10 |
Initial Hydro Pressure: 2099 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 1200 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 59 PSI Final Shut-in Pressure: 1187 PSI Final Hydro Pressure: 2066 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4252 ft. |
IF-Weak-building to 4"" ISI-Bled off blow-blow came back- weak surface FF-Weak-building to 7"" fair blow FSI-Bled off blow-blow came back-weak surface blow | |
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 120 of Total Fluid 30 of Fluid in Drill Collars 90 of Fluid in Drill Pipe 60 of Mud cut oil 50%o 50%m 60 of Oil cut mud 30%o 70%m | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4341 to 4360
Formation tested: Cherokee | Date, Time: 25-NOV-98; 11:09:26 |
Initial Hydro Pressure: 2178 PSI
First Initial Flow Pressure: 71 PSI First Final Flow Pressure: 209 PSI Initial Shut-in Pressure: 1231 PSI Second Initial Flow Pressure: 228 PSI Second Final Flow Pressure: 463 PSI Final Shut-in Pressure: 1247 PSI Final Hydro Pressure: 2080 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4404 ft. |
IF-Strong-bottom of bucket in 4 min ISI-bled off blow-no blow back FF-Strong- bottom of bucket in 5 min FSI-bled off blow-no blow back | |
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 992 of Total Fluid 30 of Fluid in Drill Collars 962 of Fluid in Drill Pipe 992 of Water 100%w 18000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |