API: 15-151-22171
Operator: Vincent Oil Corp. Field: Moffett West Lease: Gillam Well 1 |
Location: T29S R15W, Sec. 33, SW SE SE
330 North, 1030 West, from SE corner Longitude: -98.9605238 Latitude: 37.4711637 County: Pratt Status: D&A |
Spud Date: 02-DEC-98
Completion Date: 13-DEC-98 Plugging Date: 13-DEC-98 Total Depth: 4729 Form. at depth: ARBUCKLE Elevation: 1948 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 2218 to 2245
Formation tested: Krider | Date, Time: 04-DEC-98; 18:07:42 |
Initial Hydro Pressure: 1151 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 640 PSI Second Initial Flow Pressure: 33 PSI Second Final Flow Pressure: 45 PSI Final Shut-in Pressure: 534 PSI Final Hydro Pressure: 1134 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 1708 ft. |
IFP-weak building to a strong blow in 13 min.,had a weak blow back on shut-in FFP-weak blow throughout 1/2"" to 2 1/2"" | |
Bottom Hole Temperature: 86 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of gas in pipe 60 of gas cut mud 20%gas 80%mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4031 to 4058
Formation tested: Lansing""B"" | Date, Time: 08-DEC-98; 06:18:38 |
Initial Hydro Pressure: 1942 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 1312 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 1207 PSI Final Hydro Pressure: 1937 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 214.42 ft. Drill Pipe Length: ft. |
Initial Flow: Fair blow - bottom of bucket in 2 minutes - 40 seconds Initial Shutin: Bled down for 10 minutes no blow back Final Flow: Strong blow built to bottom of bucket in 15 seconds Final Shutin: surface blow. Bled down for 5 minutes built to weak surface blow |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 2481 of Gas in pipe 60 of Very slight gas cut mud 92% mud 8% gas | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |