Drill Stem Tests Database
Specific Well--15-151-22171
API: 15-151-22171
Operator: Vincent Oil Corp.
Field: Moffett West
Lease: Gillam
Well 1
Location: T29S R15W, Sec. 33, SW SE SE
330 North, 1030 West, from SE corner
Longitude: -98.9605238
Latitude: 37.4711637
County: Pratt
Status: D&A
Spud Date: 02-DEC-98
Completion Date: 13-DEC-98
Plugging Date: 13-DEC-98
Total Depth: 4729
Form. at depth: ARBUCKLE
Elevation: 1948 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2218 to 2245
Formation tested: Krider
Date, Time: 04-DEC-98; 18:07:42
Initial Hydro Pressure: 1151 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 640 PSI
Second Initial Flow Pressure: 33 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 534 PSI
Final Hydro Pressure: 1134 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 520 ft.
Drill Pipe Length: 1708 ft.
IFP-weak building to a strong blow in 13 min.,had a weak blow back on shut-in FFP-weak blow throughout 1/2"" to 2 1/2""
Bottom Hole Temperature: 86 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of gas in pipe
60 of gas cut mud 20%gas 80%mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4031 to 4058
Formation tested: Lansing""B""
Date, Time: 08-DEC-98; 06:18:38
Initial Hydro Pressure: 1942 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 1312 PSI
Second Initial Flow Pressure: 18 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 1207 PSI
Final Hydro Pressure: 1937 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 214.42 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow - bottom of bucket in 2 minutes - 40 seconds Initial Shutin: Bled down for 10 minutes no blow back
Final Flow: Strong blow built to bottom of bucket in 15 seconds
Final Shutin: surface blow. Bled down for 5 minutes built to weak surface blow
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
2481 of Gas in pipe
60 of Very slight gas cut mud 92% mud 8% gas
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.