|
API: 15-155-21428
Operator: Hesse Petroleum Co. Field: Wildcat Lease: Horton Well 1-36 |
Location: T23S R10W, Sec. 36, NW SE
2160 North, 1850 West, from SE corner Longitude: -98.3685873 Latitude: 38.0047976 County: Reno Status: D&A |
Spud Date: 10-AUG-98
Completion Date: 17-AUG-98 Plugging Date: 17-AUG-98 Total Depth: 4055 Form. at depth: SIMPSON 1 Elevation: 1757 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3695 to 3715
Formation tested: Mississippi | Date, Time: 15-AUG-98; 08:43:34 |
|
Initial Hydro Pressure: 1815 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 149 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 35 PSI Final Shut-in Pressure: 158 PSI Final Hydro Pressure: 1798 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 485 ft. Drill Pipe Length: 3206 ft. |
| 1ST FLOW: weak blow 1/2"" blow building to 7"" 1ST SHUTIN: no blow FINAL FLOW: weak 3/4"" blow building to 3"" | |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 300 of gas in pipe 30 of slightly oil cut mud 5% oil 95% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3891 to 3912
Formation tested: Viola | Date, Time: 16-AUG-98; 10:11:32 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 485 ft. Drill Pipe Length: 3392 ft. |
| 1ST FLOW: strong blow building to bottom of bucket in 1 minute 1ST SHUTIN: weak surface blow FINAL FLOW: weak 3/4"" blow building to 3"" FINAL SHUTIN: | |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1540 of Total Fluid 485 of Fluid in Drill Collars 1055 of Fluid in Drill Pipe 120 of gas in pipe 1540 of gassy oil specked water 1% oil 96% water 33000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |