API: 15-171-20529
Operator: WABASH ENERGY CORP Field: Beckley North Lease: Schowalter Well 2 |
Location: T18S R32W, Sec. 12, NE SW SE NW
1985 South, 1933 East, from NW corner Longitude: -100.8075819 Latitude: 38.5064642 County: Scott Status: OIL |
Spud Date: 24-FEB-98
Completion Date: 10-MAR-98 Plugging Date: Total Depth: 4633 Form. at depth: Elevation: 2969 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4180 to 4206
Formation tested: Lans/KC | Date, Time: 01-MAR-98; 06:30:23 |
Initial Hydro Pressure: 1998 PSI
First Initial Flow Pressure: 10 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 1043 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 26 PSI Final Shut-in Pressure: 1012 PSI Final Hydro Pressure: 1981 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3554 ft. |
Initial Flow: Weak surface blow steady throughout Final Flow: No return blow |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Drilling Mud w/spots of oil on top | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4534 to 4551
Formation tested: Cherokee | Date, Time: 02-MAR-98; 17:22:40 |
Initial Hydro Pressure: 2066 PSI
First Initial Flow Pressure: 59 PSI First Final Flow Pressure: 244 PSI Initial Shut-in Pressure: 1011 PSI Second Initial Flow Pressure: 264 PSI Second Final Flow Pressure: 457 PSI Final Shut-in Pressure: 1003 PSI Final Hydro Pressure: 2108 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3894 ft. |
IF; Fair to strong blow off bttm in 3 mins. ISI; Bled off blow - Surface return off bttm in 9 mins. FF; Fair to strong blow off bttm in 5 mins. FSI; Bled off blow - Surface return off bttm in 14 mins. | |
Bottom Hole Temperature: 139 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1190 of Total Fluid 1190 of Fluid in Drill Pipe 3040 of GIP 1070 of CGO 15%gas 85%oil 120 of GMCO 20%gas 50%oil 30%mud 30 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |