|
API: 15-171-20531
Operator: Cross Bar Petroleum, Inc. Field: Wildcat Lease: Thon Well 1-35 |
Location: T16S R31W, Sec. 35, SW SW NW
2310 South, 330 East, from NW corner Longitude: -100.7228173 Latitude: 38.6217635 County: Scott Status: D&A |
Spud Date: 07/14/1998
Completion Date: 07/25/1998 Plugging Date: 07/25/1998 Total Depth: 4650 Form. at depth: MISSISSIPPIAN Elevation: 2855 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3939 to 3952
Formation tested: Lans ""B"" | Date, Time: 07/19/1998; 16:24:32 |
|
Initial Hydro Pressure: 1895 PSI
First Initial Flow Pressure: 53 PSI First Final Flow Pressure: 68 PSI Initial Shut-in Pressure: 1065 PSI Second Initial Flow Pressure: 78 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1896 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 247 ft. Drill Pipe Length: 3684 ft. |
| I.O.- Tool slide 14' to bottom, 1 1/2""in I.S.I.- No return F.F.- No blow, flush tool after 5 min. | |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 65 of Fluid in Drill Collars 65 of heavy drilg mud 100% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: | Data Source: TRILOBITE |
|
Interval: to
Formation tested: | Date, Time: 07/09/1998; 07:40:13 |
|
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4082 to 4106
Formation tested: H"" | Date, Time: 07/21/1998; 01:35:06 |
|
Initial Hydro Pressure: 2068 PSI
First Initial Flow Pressure: 48 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 1131 PSI Second Initial Flow Pressure: 55 PSI Second Final Flow Pressure: 63 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1964 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 247 ft. Drill Pipe Length: 3838 ft. |
| I.O.- Tool slide 15' to bottom 3/4""in. I.S.I.- No return F.F.- No blow - flush tool good surge- | |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 65 of Fluid in Drill Collars 15 of slitly oil cut mud 8%oil 92% mud 50 of drilg mud 100% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4084 to 4126
Formation tested: H"" | Date, Time: 07/21/1998; 13:24:33 |
|
Initial Hydro Pressure: 1993 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 31 PSI Initial Shut-in Pressure: 1056 PSI Second Initial Flow Pressure: 34 PSI Second Final Flow Pressure: 41 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1984 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 247 ft. Drill Pipe Length: 3839 ft. |
| I.O.- Weak surface blow died in 7 min. I.S.I.- No return F.F.- No blow wait 5 min. flush tool, good surge no blow pull tool. | |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of slitly oil cut mud 8%oil 92% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4120 to 4150
Formation tested: I"" | Date, Time: 07/22/1998; 00:50:57 |
|
Initial Hydro Pressure: 2015 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 615 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1991 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 247 ft. Drill Pipe Length: 3870 ft. |
| I.O.- Weak surface blow died in 3 min. I.S.I.- No return F.F.- No blow flush tool no blow | |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2 of Total Fluid 2 of Fluid in Drill Collars 2 of slitly oil cut mud 5% oil 95% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 6 | Data Source: TRILOBITE |
|
Interval: 4150 to 4200
Formation tested: J-K"" | Date, Time: 07/22/1998; 14:41:05 |
|
Initial Hydro Pressure: 2222 PSI
First Initial Flow Pressure: 56 PSI First Final Flow Pressure: 533 PSI Initial Shut-in Pressure: 1075 PSI Second Initial Flow Pressure: 542 PSI Second Final Flow Pressure: 777 PSI Final Shut-in Pressure: 1075 PSI Final Hydro Pressure: 2137 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 247 ft. Drill Pipe Length: 3933 ft. |
| I.O.- B.O.B. in 3 1/2 min. I.S.I.- No return F.F.- B.O.B. in 4 1/2 min. F.S.I.- No return | |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1627 of Total Fluid 247 of Fluid in Drill Collars 1380 of Fluid in Drill Pipe 65 of watery mud trace of oil 30%water 70% mud 120 of mud cut water trace of oil 75%water 25%mud 200 of slit mud cut water trace of oil 1242 of water w/oil spots 100% water 29000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |