|
API: 15-171-20535
Operator: Wabash Energy Corp. Field: Beckley Lease: Riney Heirs Well 1 |
Location: T18S R32W, Sec. 13, SE NW
1980 South, 1980 East, from NW corner Longitude: -100.8072075 Latitude: 38.4919538 County: Scott Status: D&A |
Spud Date: 15-JUL-98
Completion Date: 24-JUL-98 Plugging Date: 24-JUL-98 Total Depth: 4666 Form. at depth: MISSISSIPPIAN Elevation: 2972 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4464 to 4482
Formation tested: Upper Cherokee ""A"" | Date, Time: 23-JUL-98; -23:-45:- |
|
Initial Hydro Pressure: 2228 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 993 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 33 PSI Final Shut-in Pressure: 779 PSI Final Hydro Pressure: 2201 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4444 ft. |
| IF; Weak surface blow died in 15 mins. FF; No return blow | |
|
Bottom Hole Temperature: 129 46
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 40 of Total Fluid 30 of Fluid in Drill Collars 10 of Fluid in Drill Pipe 1 of Free Oil 39 of VHOCM 10%oil 90%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3962 to 3985
Formation tested: Lans/KC | Date, Time: 20-JUL-98; 10:30:31 |
|
Initial Hydro Pressure: 1898 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 16 PSI Initial Shut-in Pressure: 705 PSI Second Initial Flow Pressure: 16 PSI Second Final Flow Pressure: 17 PSI Final Shut-in Pressure: 726 PSI Final Hydro Pressure: 1865 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3919 ft. |
| IF; Weak blow died in 3 mins. FF; No return blow | |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of HOCM | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4525 to 4565
Formation tested: Cherokee | Date, Time: 22-JUL-98; 15:40:23 |
|
Initial Hydro Pressure: 2233 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 19 PSI Initial Shut-in Pressure: 800 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 525 PSI Final Hydro Pressure: 2212 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4504 ft. |
| IF; Weak surface blow died in 5 mins. FF; No return blow | |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of VHOCM w/ free oil @ top | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4164 to 4179
Formation tested: Lans/KC ""I"" | Date, Time: 23-JUL-98; 21:05:23 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4136 ft. |
| IF; Weak surface blow built to 4"" ISI; No blow FF; Surface return in 20 mins built to 4"" FSI; No blow | |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 30 of Fluid in Drill Collars 120 of Fluid in Drill Pipe 150 of Sulfer Water 40000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |