Drill Stem Tests Database
Specific Well--15-187-20894
API: 15-187-20894
Operator: Harris Oil and Gas Co.
Field: Shore Airport
Lease: Conklin
Well 1-131
Location: T29S R39W, Sec. 31, E2 E2 NE
1300 South, 330 West, from NE corner
Longitude: -101.6177261
Latitude: 37.4864085
County: Stanton
Status: O&G-P&A
Spud Date: 14-APR-98
Completion Date: 06-MAY-98
Plugging Date: 02-APR-02
Total Depth: 5800
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3239 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5650 to 5700
Formation tested: St. Louis
Date, Time: 26-APR-98; 12:41:14
Initial Hydro Pressure: 2791 PSI
First Initial Flow Pressure: 639 PSI
First Final Flow Pressure: 789 PSI
Initial Shut-in Pressure: 1522 PSI
Second Initial Flow Pressure: 701 PSI
Second Final Flow Pressure: 761 PSI
Final Shut-in Pressure: 1518 PSI
Final Hydro Pressure: 2709 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 558 ft.
Drill Pipe Length: 5198 ft.
1st opening strong B.O.B. in 30sec. GTS in 3 min. MCF @ 2334 2nd opening strong blow B.O.B soon as open tool MCF @ 3662
Bottom Hole Temperature: 148 DEG F
Percent Porosity: 14
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
805 of Total Fluid
558 of Fluid in Drill Collars
247 of Fluid in Drill Pipe
120 of G-O 80%Gas 20%Oil
250 of G-H-O-C 20%Gas 80%Oil
435 of W-S-O & G-C 2%Gas 3%Oil 95%Water
9000 of Salinity (PPM)
48.8 of Gravity (API)
View Pressures View Recovery Gas