|
API: 15-187-20894
Operator: Harris Oil and Gas Co. Field: Shore Airport Lease: Conklin Well 1-131 |
Location: T29S R39W, Sec. 31, E2 E2 NE
1300 South, 330 West, from NE corner Longitude: -101.6177261 Latitude: 37.4864085 County: Stanton Status: O&G-P&A |
Spud Date: 14-APR-98
Completion Date: 06-MAY-98 Plugging Date: 02-APR-02 Total Depth: 5800 Form. at depth: ST. LOUIS LIMESTONE Elevation: 3239 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5650 to 5700
Formation tested: St. Louis | Date, Time: 26-APR-98; 12:41:14 |
|
Initial Hydro Pressure: 2791 PSI
First Initial Flow Pressure: 639 PSI First Final Flow Pressure: 789 PSI Initial Shut-in Pressure: 1522 PSI Second Initial Flow Pressure: 701 PSI Second Final Flow Pressure: 761 PSI Final Shut-in Pressure: 1518 PSI Final Hydro Pressure: 2709 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 558 ft. Drill Pipe Length: 5198 ft. |
| 1st opening strong B.O.B. in 30sec. GTS in 3 min. MCF @ 2334 2nd opening strong blow B.O.B soon as open tool MCF @ 3662 | |
|
Bottom Hole Temperature: 148 DEG F
Percent Porosity: 14 Samples: Yes 1 Gas Recovery: Comments: | |
|
Recovery 805 of Total Fluid 558 of Fluid in Drill Collars 247 of Fluid in Drill Pipe 120 of G-O 80%Gas 20%Oil 250 of G-H-O-C 20%Gas 80%Oil 435 of W-S-O & G-C 2%Gas 3%Oil 95%Water 9000 of Salinity (PPM) 48.8 of Gravity (API) | |
| View Pressures | View Recovery Gas |