Drill Stem Tests Database
Specific Well--15-187-20907
API: 15-187-20907
Operator: Pickrell Drilling Co.
Field: Wildcat
Lease: Harpster 'B'
Well 1
Location: T30S R41W, Sec. 5, SE NE
2130 South, 660 West, from NE corner
Longitude: -101.8186652
Latitude: 37.4701733
County: Stanton
Status: D&A
Spud Date: 12-OCT-98
Completion Date: 25-OCT-98
Plugging Date: 25-OCT-98
Total Depth: 5620
Form. at depth: MISSISSIPPIAN
Elevation: 3408 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5374 to 5394
Formation tested: upper Keys
Date, Time: 22-OCT-98; 06:09:12
Initial Hydro Pressure: 2673 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2566 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 239 ft.
Drill Pipe Length: 5139 ft.
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 8
Samples:
Gas Recovery:
Comments:
Recovery
450 of Total Fluid
239 of Fluid in Drill Collars
211 of Fluid in Drill Pipe
450 of 100% drlg. Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5376 to 5394
Formation tested: Upper Keys
Date, Time: 22-OCT-98; 12:10:49
Initial Hydro Pressure: 2758 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2622 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 239 ft.
Drill Pipe Length: 5139 ft.
Initial Flow: Weak blow for 7 minutes then lost packer seat
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 8
Samples:
Gas Recovery:
Comments:
Recovery
330 of Total Fluid
239 of Fluid in Drill Collars
91 of Fluid in Drill Pipe
330 of 100% Drlg. Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5413 to 5430
Formation tested: Lower Keys
Date, Time: 23-OCT-98; 04:20:46
Initial Hydro Pressure: 2701 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 19 PSI
Initial Shut-in Pressure: 25 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 20 PSI
Final Shut-in Pressure: 21 PSI
Final Hydro Pressure: 2619 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 239 ft.
Drill Pipe Length: 5169 ft.
1st opening weak surface blow throught. 2nd. opening No blow.
Bottom Hole Temperature: 124 DEG F
Percent Porosity: 6
Samples: NO
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of 100% Drlg. Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 2380 to 2438
Formation tested: Chase Grove
Date, Time: 25-OCT-98; 03:15:47
Initial Hydro Pressure: 1206 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1202 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 2193 ft.
Bottom Hole Temperature: 100 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
390 of Total Fluid
240 of Fluid in Drill Collars
150 of Fluid in Drill Pipe
390 of 100% Drlg. Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.