API: 15-187-20908
Operator: Pickrell Drilling Co., Inc. Field: Wildcat Lease: Hanke Trust 'A' Well 1 |
Location: T30S R41W, Sec. 18, N2 SW NE
1650 South, 1980 West, from NE corner Longitude: -101.841372 Latitude: 37.4424897 County: Stanton Status: D&A |
Spud Date: 27-OCT-98
Completion Date: 09-NOV-98 Plugging Date: 09-NOV-98 Total Depth: 5650 Form. at depth: MISSISSIPPIAN Elevation: 3444 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5388 to 5412
Formation tested: Morrow | Date, Time: 06-NOV-98; 13:47:24 |
Initial Hydro Pressure: 2734 PSI
First Initial Flow Pressure: 44 PSI First Final Flow Pressure: 124 PSI Initial Shut-in Pressure: 1417 PSI Second Initial Flow Pressure: 110 PSI Second Final Flow Pressure: 257 PSI Final Shut-in Pressure: 1254 PSI Final Hydro Pressure: 2665 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 239 ft. Drill Pipe Length: 5159 ft. |
IF: Weak to strong blow off bottom in 7 mins. ISI: Surface return built to 9"" FF: Strong blow off bottom in 2 mins. GTS @ 65 mins. TSTM FSI: Surface return built to 5"" | |
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 600 of Total Fluid 240 of Fluid in Drill Collars 90 of CGO 30%gas 70%oil 180 of GMCO 60%gas 30%oil 10%mud 330 of SW 40000 of Salinity (PPM) 36 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5433 to 5446
Formation tested: Morrow | Date, Time: 07-NOV-98; 10:10:43 |
Initial Hydro Pressure: 2718 PSI
First Initial Flow Pressure: 53 PSI First Final Flow Pressure: 107 PSI Initial Shut-in Pressure: 1209 PSI Second Initial Flow Pressure: 132 PSI Second Final Flow Pressure: 231 PSI Final Shut-in Pressure: 1269 PSI Final Hydro Pressure: 2668 PSI |
Tool Data Hole Size: in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 239 ft. Drill Pipe Length: 5128 ft. |
IF; Strong blow off botttom in 30 secs. ISI; Weak surface return built to 2"" FF; Fair to strong blow off bottom in 5 mins. FSI; No return blow | |
Bottom Hole Temperature: 138 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 480 of Total Fluid 240 of Fluid in Drill Collars 240 of Fluid in Drill Pipe 390 of GIP 30 of FO 60 of GMCO 15%gas 45%oil 5%wtr 35%mud 390 of SW 44000 of Salinity (PPM) 35 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |