Drill Stem Tests Database
Specific Well--15-191-22324
API: 15-191-22324
Operator: Noble Petroleum, Inc.
Field: Mirt
Lease: Mirt
Well 1
Location: T34S R1W, Sec. 15, SE NE SW
1421 North, 2859 West, from SE corner
Longitude: -97.4107972
Latitude: 37.0895699
County: Sumner
Status: OIL-P&A
Spud Date: 10-OCT-98
Completion Date: 23-OCT-98
Plugging Date: 20-JUN-01
Total Depth: 4550
Form. at depth: ARBUCKLE
Elevation: 1153 KB
Discovery well for Mirt field.

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2778 to 2797
Formation tested: Stalnaker
Date, Time: 15-OCT-98; 00:25:41
Initial Hydro Pressure: 1363 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 155 PSI
Initial Shut-in Pressure: 1086 PSI
Second Initial Flow Pressure: 159 PSI
Second Final Flow Pressure: 277 PSI
Final Shut-in Pressure: 1087 PSI
Final Hydro Pressure: 1350 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2766 ft.
IF:Strong Blow. BOB in 5.5 mins. ISI:Fair to strong blow. BOB in 30 mins. FF:Strong blow. BOB in 8 mins. FSI:Fair blow. ( 1 - 10"")
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 16
Samples: none
Gas Recovery:
Comments:
Recovery
480 of Total Fluid
480 of Fluid in Drill Pipe
880 of Gas in pipe.
70 of GMCO 20%g 7%m 73%o
110 of GOCMW 10%g 5%o 20%m 65%w
300 of MW with oil specs. 5%m 95%w
88000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3122 to 3152
Formation tested: Layton
Date, Time: 16-OCT-98; 04:51:44
Initial Hydro Pressure: 1587 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 1252 PSI
Second Initial Flow Pressure: 69 PSI
Second Final Flow Pressure: 67 PSI
Final Shut-in Pressure: 1244 PSI
Final Hydro Pressure: 1526 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3106 ft.
Initial Flow: Fair to strong blow - bottom of bucket in 12 minutes Initial Shutin: Weak blow (1 1/2"")
Final Flow: Strong blow - bottom of bucket in 5 seconds
Final Shutin: No blow
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Pipe
1730 of Gas in pipe.
130 of Gas Oil Cut Mud 23%g 17%o 60%m
6000 of Salinity (PPM)
View Pressures No Recovery Gas data.