|
API: 15-191-22324
Operator: Noble Petroleum, Inc. Field: Mirt Lease: Mirt Well 1 |
Location: T34S R1W, Sec. 15, SE NE SW
1421 North, 2859 West, from SE corner Longitude: -97.4107972 Latitude: 37.0895699 County: Sumner Status: OIL-P&A |
Spud Date: 10-OCT-98
Completion Date: 23-OCT-98 Plugging Date: 20-JUN-01 Total Depth: 4550 Form. at depth: ARBUCKLE Elevation: 1153 KB |
| Discovery well for Mirt field. | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 2778 to 2797
Formation tested: Stalnaker | Date, Time: 15-OCT-98; 00:25:41 |
|
Initial Hydro Pressure: 1363 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 155 PSI Initial Shut-in Pressure: 1086 PSI Second Initial Flow Pressure: 159 PSI Second Final Flow Pressure: 277 PSI Final Shut-in Pressure: 1087 PSI Final Hydro Pressure: 1350 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2766 ft. |
| IF:Strong Blow. BOB in 5.5 mins. ISI:Fair to strong blow. BOB in 30 mins. FF:Strong blow. BOB in 8 mins. FSI:Fair blow. ( 1 - 10"") | |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 16 Samples: none Gas Recovery: Comments: | |
|
Recovery 480 of Total Fluid 480 of Fluid in Drill Pipe 880 of Gas in pipe. 70 of GMCO 20%g 7%m 73%o 110 of GOCMW 10%g 5%o 20%m 65%w 300 of MW with oil specs. 5%m 95%w 88000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3122 to 3152
Formation tested: Layton | Date, Time: 16-OCT-98; 04:51:44 |
|
Initial Hydro Pressure: 1587 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 43 PSI Initial Shut-in Pressure: 1252 PSI Second Initial Flow Pressure: 69 PSI Second Final Flow Pressure: 67 PSI Final Shut-in Pressure: 1244 PSI Final Hydro Pressure: 1526 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3106 ft. |
|
Initial Flow: Fair to strong blow - bottom of bucket in 12 minutes Initial Shutin: Weak blow (1 1/2"") Final Flow: Strong blow - bottom of bucket in 5 seconds Final Shutin: No blow |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 130 of Total Fluid 130 of Fluid in Drill Pipe 1730 of Gas in pipe. 130 of Gas Oil Cut Mud 23%g 17%o 60%m 6000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |