|
API: 15-191-22326
Operator: NOBLE PETROLEUM Field: Wildcat Lease: Mason Well 1 |
Location: T34S R1W, Sec. 14, NW NW SW SE
1262 North, 2402 West, from SE corner Longitude: -97.390844 Latitude: 37.0894743 County: Sumner Status: OIL |
Spud Date: 10/28/1998
Completion Date: 11/15/1998 Plugging Date: Total Depth: 4450 Form. at depth: ARBUCKLE Elevation: 1173 KB |
| Discovery well for Mirt East field. | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3168 to 3194
Formation tested: Layton sd. | Date, Time: 11/07/1998; 21:38:57 |
|
Initial Hydro Pressure: 1625 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 1249 PSI Second Initial Flow Pressure: 33 PSI Second Final Flow Pressure: 48 PSI Final Shut-in Pressure: 1244 PSI Final Hydro Pressure: 1516 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3166 ft. |
| IF:Weak blow built to 5""in H2O bucket. ISI:Bled down for 20 mins FF:Weak blow built to 4"" in H2O bucket. FSI:Bled down for 10 mins no bb. | |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 30 of WCM 30%water 70%mud trace of oil 60 of SMCW 80%water 20%mud 50000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3395 to 3470
Formation tested: K C | Date, Time: 11/09/1998; 05:24:56 |
|
Initial Hydro Pressure: 1648 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 24 PSI Initial Shut-in Pressure: 599 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: 649 PSI Final Hydro Pressure: 1603 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3386 ft. |
|
Initial Flow: Weak blow throughout 1/2"" to 1/4"" blow Final Flow: No blow |
|
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3881 to 3907
Formation tested: miss | Date, Time: 11/11/1998; 05:21:04 |
|
Initial Hydro Pressure: 1910 PSI
First Initial Flow Pressure: 98 PSI First Final Flow Pressure: 171 PSI Initial Shut-in Pressure: 1547 PSI Second Initial Flow Pressure: 120 PSI Second Final Flow Pressure: 137 PSI Final Shut-in Pressure: 1503 PSI Final Hydro Pressure: 1858 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3881 ft. |
| IFP-strong FFP-gas to surface | |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: gas sample two bottles Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 150 of Fluid in Drill Pipe 30 of slightly oil&gas cut mud 5%gas 3%oil92%mud 60 of heavy oil cut gassy mud 15 gas 20 oil 65 mud 60 of muddy gassy oil 15%gas 45%oil 40%mud | |
| View Pressures | View Recovery Gas |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4232 to 4276
Formation tested: simpson sd. | Date, Time: 11/13/1998; 09:52:43 |
|
Initial Hydro Pressure: 2091 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 41 PSI Initial Shut-in Pressure: 1640 PSI Second Initial Flow Pressure: 48 PSI Second Final Flow Pressure: 66 PSI Final Shut-in Pressure: 1639 PSI Final Hydro Pressure: 2077 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4229 ft. |
| IFP-weak building to a strong blow in 8"" FFP-strong blow throughout no blow back on shut-ins | |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 115 of Total Fluid 115 of Fluid in Drill Pipe 3600 of gas in pipe 55 of oil cut gassy mud 10%oil 35%gas 65%mud 60 of heavy oil cut gassy mud 17%oil 62%gas 21%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4276 to 4284
Formation tested: simpson sd | Date, Time: 11/13/1998; 23:18:18 |
|
Initial Hydro Pressure: 2102 PSI
First Initial Flow Pressure: 113 PSI First Final Flow Pressure: 262 PSI Initial Shut-in Pressure: 1634 PSI Second Initial Flow Pressure: 295 PSI Second Final Flow Pressure: 439 PSI Final Shut-in Pressure: 1635 PSI Final Hydro Pressure: 2031 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4260 ft. |
| IFP-strong blow gas to surface in 13min. had blow back on shut-in FFP-gas to surface had blow back on shut-in | |
|
Bottom Hole Temperature: 138 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1050 of Total Fluid 1050 of Fluid in Drill Pipe 500 of clean oil 185 of muddy gassy oil 40% gas 53% oil 7%mud 370 of water rw .07 @ 70F 120000 of Salinity (PPM) 40 of Gravity (API) | |
| View Pressures | View Recovery Gas |