|
API: 15-033-21002
Operator: Sagebrush Operating LLC Field: Ham East Lease: Merrill Ranch Well 36-5 |
Location: T33S R16W, Sec. 36, NW SW NW
1650 South, 330 East, from NW corner Longitude: -99.0174278 Latitude: 37.1319202 County: Comanche Status: OIL |
Spud Date: 02/25/1999
Completion Date: 05/07/1999 Plugging Date: Total Depth: 5597 Form. at depth: ARBUCKLE Elevation: 1744 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3960 to 4025
Formation tested: Elgin sd. | Date, Time: 03/04/1999; 14:04:18 |
|
Initial Hydro Pressure: 1993 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 31 PSI Initial Shut-in Pressure: 1468 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 63 PSI Final Shut-in Pressure: 1439 PSI Final Hydro Pressure: 1917 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3979 ft. |
|
Initial Flow: Weak blow built to 4"" in water Initial Shutin: Bled down for 20 minutes no blow back Final Flow: Weak blow built to 4"" in water Final Shutin: Bled down for 10 minutes no blow back |
|
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 110 of Total Fluid 110 of Fluid in Drill Pipe 110 of Slight Mud & Gas Cut Water 50000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4854 to 4950
Formation tested: Miss | Date, Time: 03/07/1999; 21:42:34 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4875 ft. |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1800 of Total Fluid 1800 of Fluid in Drill Pipe 1800 of drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4810 to 4950
Formation tested: Miss | Date, Time: 03/08/1999; 11:13:45 |
|
Initial Hydro Pressure: 2425 PSI
First Initial Flow Pressure: 1091 PSI First Final Flow Pressure: 1382 PSI Initial Shut-in Pressure: 1776 PSI Second Initial Flow Pressure: 1463 PSI Second Final Flow Pressure: 1614 PSI Final Shut-in Pressure: 1763 PSI Final Hydro Pressure: 2171 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4909 ft. |
|
Initial Flow:IF: Strong blow bottom of bucket in 15 secs. Initial Shut-in: Bled down for 5 mins. built back to bottom of bucket in 30 mins. Final Flow: Strong blow bottom of bucket in 30 secs. Final Shut-in: Bled down for 5 mins. built back to bottom of bucket. |
|
|
Bottom Hole Temperature: 134 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 3840 of Total Fluid 3840 of Fluid in Drill Pipe 1000 of Oil & gas cut mud 6%gas Trace of oil 94%mud 500 of Slight gas & oil cut mud 10%gas 2%oil 88%mud 1000 of Oil & gas cut mud 14%gas 16%oil 70%mud 1200 of Heavy oil & gas cut mud 50%gas 40%oil 10%mud 140 of Slight oil & gas cut mud 16%gas 14%oil 70%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 5320 to 5357
Formation tested: | Date, Time: 03/10/1999; 19:20:19 |
|
Initial Hydro Pressure: 2577 PSI
First Initial Flow Pressure: 52 PSI First Final Flow Pressure: 585 PSI Initial Shut-in Pressure: 2013 PSI Second Initial Flow Pressure: 594 PSI Second Final Flow Pressure: 1380 PSI Final Shut-in Pressure: 2013 PSI Final Hydro Pressure: 2565 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5315 ft. |
|
Initial Flow: Fair blow bottom of bucket in 3 1/2 mins. Initial Shut-in: Bled down for 5 mins. blow back to 1 1/2"" Final Flow: Fair blow bottomo of bucket in 3 mins Initial Shut-in: Bled down for 5 mins. no blow back |
|
|
Bottom Hole Temperature: 146 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2992 of Total Fluid 2992 of Fluid in Drill Pipe 120 of Gas in pipe 200 of Slight gas cut muddy water 313 of Slight mud cut water 90% water 10% mud 2479 of Salt water 120000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 5382 to 5390
Formation tested: upper (Simpsom) | Date, Time: 03/11/1999; 17:50:21 |
|
Initial Hydro Pressure: 2599 PSI
First Initial Flow Pressure: 59 PSI First Final Flow Pressure: 545 PSI Initial Shut-in Pressure: 2019 PSI Second Initial Flow Pressure: 560 PSI Second Final Flow Pressure: 1287 PSI Final Shut-in Pressure: 2009 PSI Final Hydro Pressure: 2499 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5379 ft. |
|
Initial Flow: Fair blow bottom of bucket in 3 mins. Initial Shut-in: Bled down for 5 mins. blow back to 1 1/2"" Final Flow: Fair blow built to bottom of bucket in 4 mins. Final Shut-in: Bled down for 5 mins. no blow back. |
|
|
Bottom Hole Temperature: 146 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2917 of Total Fluid 2917 of Fluid in Drill Pipe 90 of Gas in pipe 180 of Slight mud cut water 2737 of Salt water 115000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |