API: 15-119-20999
Operator: Field: Johan Lease: Davis Well 3-24 |
Location: T34S R28W, Sec. 24, SW NE NE
960 South, 805 West, from NE corner Longitude: -100.3096949 Latitude: 37.0793306 County: Meade Status: D&A |
Spud Date: 17-APR-99
Completion Date: 23-APR-99 Plugging Date: 23-APR-99 Total Depth: 3350 Form. at depth: COUNCIL GROVE GROUP Elevation: 2351 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3205 to 3235
Formation tested: Council Grove | Date, Time: 22-APR-99; 16:00:20 |
Initial Hydro Pressure: 1547 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 63 PSI Initial Shut-in Pressure: 948 PSI Second Initial Flow Pressure: 57 PSI Second Final Flow Pressure: 139 PSI Final Shut-in Pressure: 953 PSI Final Hydro Pressure: 1529 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 120 ft. Drill Pipe Length: 3075 ft. |
Initial Flow: Strong blow off bttm immediately Gas to surface in 10 mins. Initial Shut-in: Bled off blow - weak to fair blow off bottom in 4 mins. Final Flow: Strong blow gauged 26""wtr on 3/4"" = 72.4 mcf/day Final Shut-in: Bled off blow - Weak return built off bottom in 10 mins. |
|
Bottom Hole Temperature: 93 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 3 of Total Fluid 120 of Fluid in Drill Collars 180 of Fluid in Drill Pipe 120 of Gassy mud 20%gas 80%mud 180 of Gassy water 10%gas 90%water 90000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |