|
API: 15-155-21435
Operator: Field: Mcarthur Lease: Bostick Well 1-19 |
Location: T23S R7W, Sec. 19, SE SW SW
540 North, 810 East, from SW corner Longitude: -98.1390002 Latitude: 38.0298711 County: Reno Status: D&A |
Spud Date: 02-JUN-99
Completion Date: 07-JUN-99 Plugging Date: 07-JUN-99 Total Depth: 3825 Form. at depth: ARBUCKLE Elevation: 1611 KB |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3651 to 3700
Formation tested: Miss | Date, Time: 06-JUN-99; 18:24:46 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 498 ft. Drill Pipe Length: 3160 ft. |
| Initial Flow: Strong blow Packers failing picked up and re-set using more weight packers failed | |
|
Bottom Hole Temperature: 107 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 598 of Total Fluid 498 of Fluid in Drill Collars 100 of Fluid in Drill Pipe 598 of Drilling mud 9000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |