|
API: 15-109-20678
Operator: John O. Farmer, Inc. Field: Wildcat Lease: Fairleigh Ranch Well 1 |
Location: T15S R32W, Sec. 30, NE SW SE
990 North, 1650 West, from SE corner Longitude: -100.9160481 Latitude: 38.716196 County: Logan Status: D&A |
Spud Date: 08-MAY-99
Completion Date: 19-MAY-99 Plugging Date: 19-MAY-99 Total Depth: 4652 Form. at depth: MISSISSIPPIAN Elevation: 2856 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4455 to 4514
Formation tested: Cher. Sd. | Date, Time: 18-MAY-99; 18:13:37 |
|
Initial Hydro Pressure: 2240 PSI
First Initial Flow Pressure: 38 PSI First Final Flow Pressure: 90 PSI Initial Shut-in Pressure: 1032 PSI Second Initial Flow Pressure: 95 PSI Second Final Flow Pressure: 123 PSI Final Shut-in Pressure: 943 PSI Final Hydro Pressure: 2175 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4397 ft. |
|
Initial Flow: Weak building to a good blow 1/2"" to 8"" blow Final Flow: Weak blow throughout 1/2"" blow |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 210 of Total Fluid 30 of Fluid in Drill Collars 120 of Fluid in Drill Pipe 90 of Slight oil cut mud 1% oil 25% water 74% mud 120 of Muddy water 60% water 40% mud 32000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4182 to 4285
Formation tested: Marmaton | Date, Time: 16-MAY-99; 23:10:27 |
|
Initial Hydro Pressure: 2114 PSI
First Initial Flow Pressure: 53 PSI First Final Flow Pressure: 84 PSI Initial Shut-in Pressure: 1178 PSI Second Initial Flow Pressure: 87 PSI Second Final Flow Pressure: 111 PSI Final Shut-in Pressure: 1135 PSI Final Hydro Pressure: 2098 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4157 ft. |
|
Initial Flow: Weak surface blow slowly built to 1/2"" Final Flow: No return blow |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 140 of Total Fluid 30 of Fluid in Drill Collars 110 of Fluid in Drill Pipe 140 of Drilling mud with oil stains | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4463 to 4490
Formation tested: Cherokee | Date, Time: 17-MAY-99; 10:03:43 |
|
Initial Hydro Pressure: 2232 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 640 PSI Initial Shut-in Pressure: 1134 PSI Second Initial Flow Pressure: 654 PSI Second Final Flow Pressure: 988 PSI Final Shut-in Pressure: 1135 PSI Final Hydro Pressure: 2223 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4434 ft. |
|
Initial Flow: Fair to strong blow off bottom in 12 mins. Initial Shut-in: No return blow Final Flow: Fair to strong blow off bottom in 3 mins. Final Shut-in: No return blow |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2056 of Total Fluid 30 of Fluid in Drill Collars 2026 of Fluid in Drill Pipe 568 of Muddy water 85% water 15% mud 1488 of Salt water 40000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |