Drill Stem Tests Database
Specific Well--15-109-20678
API: 15-109-20678
Operator: John O. Farmer, Inc.
Field: Wildcat
Lease: Fairleigh Ranch
Well 1
Location: T15S R32W, Sec. 30, NE SW SE
990 North, 1650 West, from SE corner
Longitude: -100.9160481
Latitude: 38.716196
County: Logan
Status: D&A
Spud Date: 08-MAY-99
Completion Date: 19-MAY-99
Plugging Date: 19-MAY-99
Total Depth: 4652
Form. at depth: MISSISSIPPIAN
Elevation: 2856 KB
Test Number: 3 Data Source: TRILOBITE
Interval: 4455 to 4514
Formation tested: Cher. Sd.
Date, Time: 18-MAY-99; 18:13:37
Initial Hydro Pressure: 2240 PSI
First Initial Flow Pressure: 38 PSI
First Final Flow Pressure: 90 PSI
Initial Shut-in Pressure: 1032 PSI
Second Initial Flow Pressure: 95 PSI
Second Final Flow Pressure: 123 PSI
Final Shut-in Pressure: 943 PSI
Final Hydro Pressure: 2175 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4397 ft.
Initial Flow: Weak building to a good blow 1/2"" to 8"" blow
Final Flow: Weak blow throughout 1/2"" blow
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
30 of Fluid in Drill Collars
120 of Fluid in Drill Pipe
90 of Slight oil cut mud 1% oil 25% water 74% mud
120 of Muddy water 60% water 40% mud
32000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4182 to 4285
Formation tested: Marmaton
Date, Time: 16-MAY-99; 23:10:27
Initial Hydro Pressure: 2114 PSI
First Initial Flow Pressure: 53 PSI
First Final Flow Pressure: 84 PSI
Initial Shut-in Pressure: 1178 PSI
Second Initial Flow Pressure: 87 PSI
Second Final Flow Pressure: 111 PSI
Final Shut-in Pressure: 1135 PSI
Final Hydro Pressure: 2098 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4157 ft.
Initial Flow: Weak surface blow slowly built to 1/2""
Final Flow: No return blow
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
140 of Total Fluid
30 of Fluid in Drill Collars
110 of Fluid in Drill Pipe
140 of Drilling mud with oil stains
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4463 to 4490
Formation tested: Cherokee
Date, Time: 17-MAY-99; 10:03:43
Initial Hydro Pressure: 2232 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 640 PSI
Initial Shut-in Pressure: 1134 PSI
Second Initial Flow Pressure: 654 PSI
Second Final Flow Pressure: 988 PSI
Final Shut-in Pressure: 1135 PSI
Final Hydro Pressure: 2223 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4434 ft.
Initial Flow: Fair to strong blow off bottom in 12 mins. Initial Shut-in: No return blow
Final Flow: Fair to strong blow off bottom in 3 mins.
Final Shut-in: No return blow
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2056 of Total Fluid
30 of Fluid in Drill Collars
2026 of Fluid in Drill Pipe
568 of Muddy water 85% water 15% mud
1488 of Salt water
40000 of Salinity (PPM)
View Pressures No Recovery Gas data.