Drill Stem Tests Database
Specific Well--15-151-22164
API: 15-151-22164
Operator: SAGEBRUSH OPERATING LLC
Field: Iuka-Carmi
Lease: LUDERS 'B'
Well 8
Location: T27S R12W, Sec. 7, SE NE SW
1949 North, 3056 West, from SE corner
Longitude: -98.674461
Latitude: 37.7092323
County: Pratt
Status: GAS
Spud Date: 07/16/1998
Completion Date: 07/24/1998
Plugging Date:
Total Depth: 4540
Form. at depth:
Elevation: 1867 KB
PTD. 4240

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2729 to 2797
Formation tested: Langdon
Date, Time: 07/19/1998; 15:58:56
Initial Hydro Pressure: 1288 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 660 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 38 PSI
Final Shut-in Pressure: 657 PSI
Final Hydro Pressure: 1258 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2718 ft.
IF:Strong blow. Btm. of bucket in 2 mins. ISI:Weak blow. FF:Strong blow. GTS in 2 mins. (see gas volume report) FSI:Weak to fair blow.
Bottom Hole Temperature: 99 DEG F
Percent Porosity: 14
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
35 of Drlg.mud.
60000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3842 to 3862
Formation tested: Lansing
Date, Time: 07/22/1998; 06:46:06
Initial Hydro Pressure: 1973 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 228 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 23 PSI
Final Shut-in Pressure: 112 PSI
Final Hydro Pressure: 1911 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3838 ft.
IF:Weak surging blow.Slow increase to 4"". ISI:No blow FF:Weak blow. (1/2"") FSI:No blow
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Pipe
90 of Gas in pipe.
20 of SOCM 1%o 99%m
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4165 to 4210
Formation tested: Viola
Date, Time: 07/23/1998; 15:22:53
Initial Hydro Pressure: 2100 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 648 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 508 PSI
Final Hydro Pressure: 2156 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4147 ft.
IF:Strong blow. Btm. of bucket in 3.5 mins. ISI:Weak blow. (1/2"") FF:Strong blow. Btm. of bucket in 5 seconds. FSI:Weak blow. (1/4"" or less)
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
960 of Gas in pipe.
35 of Gassy Mud.
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.