Drill Stem Tests Database
Specific Well--15-007-22550
API: 15-007-22550
Operator: McGinness Oil Co.
Field: Nurse
Lease: Gress
Well 3-A TWIN
Location: T31S R12W, Sec. 7, SW NE SW NW
3447 North, 4567 West, from SE corner
Longitude: -98.6744918
Latitude: 37.3646182
County: Barber
Status: SWD-P&A
Spud Date: 30-NOV-97
Completion Date: 09-DEC-97
Plugging Date: 06-NOV-19
Total Depth: 4850
Form. at depth: ARBUCKLE GROUP
Elevation: 1636 KB

Download DST Test Data

Test Number: 2 Data Source: TRILOBITE
Interval: 4147 to 4190
Formation tested: Marmaton
Date, Time: 06-DEC-97; 15:33:28
Initial Hydro Pressure: 2164 PSI
First Initial Flow Pressure: 31 PSI
First Final Flow Pressure: 29 PSI
Initial Shut-in Pressure: 36 PSI
Second Initial Flow Pressure: 26 PSI
Second Final Flow Pressure: 28 PSI
Final Shut-in Pressure: 33 PSI
Final Hydro Pressure: 2142 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4139 ft.
Initial Flow: Fair blow built to 7"" in water Initial Shutin: Bled down for 5 minutes no blow back
Final Flow: Weak blow - Died in 18 mins.
Final Shutin: No blow back
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
100 of Gas in pipe
15 of Very slightly gas cut mud 1%gas 99%mud
View Pressures No Recovery Gas data.