|
API: 15-007-22550
Operator: McGinness Oil Co. Field: Nurse Lease: Gress Well 3-A TWIN |
Location: T31S R12W, Sec. 7, SW NE SW NW
3447 North, 4567 West, from SE corner Longitude: -98.6744918 Latitude: 37.3646182 County: Barber Status: SWD-P&A |
Spud Date: 30-NOV-97
Completion Date: 09-DEC-97 Plugging Date: 06-NOV-19 Total Depth: 4850 Form. at depth: ARBUCKLE GROUP Elevation: 1636 KB |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4147 to 4190
Formation tested: Marmaton | Date, Time: 06-DEC-97; 15:33:28 |
|
Initial Hydro Pressure: 2164 PSI
First Initial Flow Pressure: 31 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 36 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 28 PSI Final Shut-in Pressure: 33 PSI Final Hydro Pressure: 2142 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4139 ft. |
|
Initial Flow: Fair blow built to 7"" in water Initial Shutin: Bled down for 5 minutes no blow back Final Flow: Weak blow - Died in 18 mins. Final Shutin: No blow back |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 15 of Total Fluid 15 of Fluid in Drill Pipe 100 of Gas in pipe 15 of Very slightly gas cut mud 1%gas 99%mud | |
| View Pressures | No Recovery Gas data. |