Drill Stem Tests Database
Specific Well--15-009-24638
API: 15-009-24638
Operator: Maxwell Operating Co., Inc.
Field: Beaver North
Lease: Ross
Well 1
Location: T16S R12W, Sec. 4, S2 NW NE
4290 North, 1980 West, from SE corner
Longitude: -98.652433
Latitude: 38.6931583
County: Barton
Status: OIL
Spud Date: 07/23/1997
Completion Date: 07/30/1997
Plugging Date:
Total Depth: 3332
Form. at depth: PENNSYLVANIAN BASAL CONGLOMERATE
Elevation: 1877 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2892 to 2931
Formation tested: Topeka
Date, Time: 07/27/1997; 18:06:06
Initial Hydro Pressure: 1386 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 323 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 50 PSI
Final Shut-in Pressure: 208 PSI
Final Hydro Pressure: 1376 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 2855 ft.
Initial Flow- strong blow--bottom of bucket in 45 seconds --- then decreased to fair blow at end of flow Initial Shutin- surface blow---died in 2 minutes
Final Flow- strong blow --bottom ofbucket in 45 seconds----then decreased to fair blow at end (same as initial)
Final Shutin- no blow
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
100 of Total Fluid
30 of Fluid in Drill Collars
70 of Fluid in Drill Pipe
600 of Gas in pipe
30 of Gassy Mud & Water Cut Oil
70 of Gassy Mud & Water Cut Oil
26000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3068 to 3090
Formation tested: Kansas City 'C'
Date, Time: 07/28/1997; 15:41:36
Initial Hydro Pressure: 1486 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 81 PSI
Second Initial Flow Pressure: 17 PSI
Second Final Flow Pressure: 20 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1476 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3036 ft.
Initial Flow- weak 1/4"" blow decreasing to surface blow. Initial Shutin- no blow
Final Flow- 1"" blow decreasing to 1/4"" in 10 minutes
Final Shutin- none taken
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
30 of Gas in Pipe
20 of Slightly Oil specked Mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3091 to 3142
Formation tested: Kansas City
Date, Time: 07/29/1997; 03:41:51
Initial Hydro Pressure: 1517 PSI
First Initial Flow Pressure: 136 PSI
First Final Flow Pressure: 287 PSI
Initial Shut-in Pressure: 467 PSI
Second Initial Flow Pressure: 297 PSI
Second Final Flow Pressure: 384 PSI
Final Shut-in Pressure: 470 PSI
Final Hydro Pressure: 1485 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3067 ft.
Initial Flow- strong blow building to bottom of bucket in 1 minute Initial Shutin- blow built to 7""
Final Flow- 1"" blow decreasing to 1/4"" in 10 minutes
Final Shutin- gas to surface at beginning of shutin blow built to bottom in 5 min
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
960 of Total Fluid
30 of Fluid in Drill Collars
930 of Fluid in Drill Pipe
150 of Gassy Mud 10%gas 90%mud
150 of Gassy Oil & Mud Cut Water
180 of Gassy Oil & Mud Cut Water
180 of Salt Water
47000 of Salinity (PPM)
View Pressures No Recovery Gas data.